0 Members and 1 Guest are viewing this topic.
I made a drawing to explain the basic theory. (Attachment Link)
Just an FYI but KATO has discontinued the hard plastic 3 way extensions 24-827. They replaced them with 24-833, which is basically just 3 daisy chained female plugs and one male connector. I also believe the cord is shorter now too.
Which brings up another issue of a standard being dependent on one manufacturer for a critical standard part. Here they at least are providing a similar replacement but what happens if a manufacturer decides not to?
I don't want to think about that.
I made a drawing to explain the basic theory.
I think what is important is that the people who make modules are not faced with a need for using components they don't get at hobby shops or most on-line retailers, and which require a rather costly special crimper.And, as for the supplier going out of business, I doubt that Anderson is guaranteed to exist forever, and the "clones" of their parts have serious compatibility issues.So, yes, Power Poles are "neato", but forcing everybody to use them everywhere for T-Trak seems like a step back from the underlying philosophy of a bunch of people being able to get together just about anywhere and use simple modules to create a pop-up layout, run it for an evening or a day or two, then break it down easily and go home.I do understand that it takes additional work and planning to put together a Guinness Book of Records T-Trak setup, but I still think you can do that with Kato connectors on the individual modules.Regarding the worry about the "jack wagon [that] can treat my track feeder wires like a silver back ape with a fresh banana, straining the connectors", I would be more worried about the actual scenery on my modules than the connectors if we start hiring such "help". And, I have spent considerable time fixing the Power Pole bus connectors on the N-Trak modules at my Club, which did suffer pullouts of the crimped wires from apparently very rough and probably ignorant "helpers". So, even the Power Poles are not "silverback proof". What is really needed is some strain relief on the wires under the modules before they get to the track where it is hard to make new connections once things are scenicked.
"I mean really what difference does it make if someone uses them or not at the modules? We have already established that there isn't any 'requirement'."
"I get it you don't like them but the plenty sure do."
First, Please refer to the actual T-TRAK standards.You can find them here:https://nrail.org/T-TRAK-StandardsOr here:https://nationalt-traklayout.com/t-trak-standards...