Time for another update. After doing the metal building, I wasn't happy with it. It was too
brown when it should have been
rusty. So I redid the weathering. This time, I used other rustier Vallejo colors. I'm not sure I'm happy with this attempt either, but I'm moving on and can circle back to it later when it's time to use the building.


I've also done a lot of work on the layout. Benchwork is now almost finished.
First, I cut the upper level piece to the right shape.

I also cut the grade.

But before that, I finished the benchwork for the curve underneath it (no in-process picture for that part). We ran out of our preferred lumber but we had some leftover 2x4s from the previous layout, ,so we used that instead.
Here is what this part of the layout looks like now. The grade is in place (~2% over 9 feet of length). The upper level is not screwed in place yet. That will happen once the "tunnel" area track work is finished.

I have also installed shelves behind each of the other backdrop corners for more RR memorabilia display. More backdrop screw holes and gaps have been spackled and given a first coat of paint. And I've begun laying down cork.
Coming soon is the wiring, which will be a whole new experience for me.