0 Members and 1 Guest are viewing this topic.
Making slow and steady progress on my EMD Model 40 project (N Scale) Thanks,Wolf
Congrats! First go-around is a real "golden spike" moment. Write the event and the date somewhere on your benchwork; it won't seem like a strange thing to do in 10 years.
I am trying to add a variety of trains to my schedule. One is a scrap train. I was going through my boxes of flat and gondola loads when I found several of the thing on the left. Crushed junk cars do not look like that, so I had to paint the loads then add dirt and rust, as on the right.You are not going to haul crushed junk cars in gondolas in perfect shape with shiny paint jobs. i decided that my first two would look really trashy. Most of the subsequent gondolas will be less trashy. I am still trying to get the hang of putting dents into the steel gondolas using a soldering iron on very low power. The dents on the Rio Grande gondola do not show up well in the photographs taken with a telephone. I did slip once on the black one and went through the side. A little putty, paint and a letter covered up that. in fact, the letter was from and old set and semi-discombobulated, which was ideal.
I had a huge triumph this week. On Friday I ran a train. Why is this such a big deal? I’ve been building N scale trains for 25 years and have never had an operational railroad in my house. On Friday that changed as I ran the first train around my train room. Still loads of work to do but this is a momentous occasion. Here’s a video of a loop around the room. Craig.
Started reworking the yard area. The upper yard had been attached to the lower yard, which is set up as a TTRAK modular design.I've separated them, and will hang the upper yard on some shelf brackets so I can pull out the TTRAK yard for those occasions when it needs the be portable.Lee
I love yours and need these crushed vehicles! Do you recall where you obtained them???
Making slow and steady progress on my EMD Model 40 project (N Scale)
Yes, all originals on Tinkercad.