Author Topic: Weekend Update 1/5/25  (Read 7865 times)

0 Members and 1 Guest are viewing this topic.

Chris333

  • Crew
  • *
  • Posts: 19683
  • Respect: +6982
Re: Weekend Update 1/5/25
« Reply #30 on: January 05, 2025, 08:34:25 PM »
+1

draskouasshat

  • Crew
  • *
  • Posts: 1010
  • Gender: Male
  • Respect: +755
Re: Weekend Update 1/5/25
« Reply #31 on: January 05, 2025, 08:40:11 PM »
+21
AC-9s are hot off the press! The AC-3s are still in the test fitting stage. I also have a Santa fe 2-10-10-2 and a milwaikee road F-6a 4-6-4 in development!
I'm finally back to printing after a little hiatus!

Drasko

[ Guests cannot view attachments ] [ Guests cannot view attachments ] [ Guests cannot view attachments ]
Draskos Modelworks. Contact me for your 3D modeling needs!
SFM (Super Fleet Modeler) member #1
I HAVE 3800 class santa fe 2-10-2s!!

bnsfdash8

  • Crew
  • *
  • Posts: 678
  • Respect: +1653
Re: Weekend Update 1/5/25
« Reply #32 on: January 05, 2025, 08:58:21 PM »
+23
I ran a test print of my GP59ECO. There's a few things I want to tweak but I like how it turned out. It rides on a FVM GP60 mech.



Reese
Modeling Norfolk Southern one loco at a time.

MK

  • Crew
  • *
  • Posts: 4370
  • Respect: +956
Re: Weekend Update 1/5/25
« Reply #33 on: January 05, 2025, 10:12:37 PM »
+1

And the washing machine chucked to the side of the road.  Just needs paint and weathering:



DFF

Now you need a matching refrigerator.  With the door off, of course.  :D

BCR 570

  • Crew
  • *
  • Posts: 2471
  • Gender: Male
  • Respect: +5029
    • BCR Dawson Creek Subdivision in N Scale
Re: Weekend Update 1/5/25
« Reply #34 on: January 05, 2025, 10:18:14 PM »
+2
These home-printed models are looking better all the time!

Tim
T. Horton
North Vancouver, B.C.
BCR Dawson Creek Subdivision in N Scale
www.bcrdawsonsub.ca
https://www.youtube.com/channel/UC3MbxkZkx7zApSYCHqu2IYQ

davefoxx

  • Crew
  • *
  • Posts: 12390
  • Gender: Male
  • TRW Plaid Member
  • Respect: +8735
Re: Weekend Update 1/5/25
« Reply #35 on: January 05, 2025, 10:23:57 PM »
+3
Now you need a matching refrigerator.  With the door off, of course.  :D

Not a bad idea!  My wife also suggested a toilet.  :D

DFF

A Proud HOer
BUY ALL THE TRAINS!
Member of the ACL & SAL RRs and the N&S Ry. Historical Societies

MK

  • Crew
  • *
  • Posts: 4370
  • Respect: +956
Re: Weekend Update 1/5/25
« Reply #36 on: January 05, 2025, 11:42:37 PM »
+1
Toilet is good too!  :)

nkalanaga

  • Crew
  • *
  • Posts: 10604
  • Respect: +1774
Re: Weekend Update 1/5/25
« Reply #37 on: January 06, 2025, 12:38:26 AM »
+1
Kitchen sink?
N Kalanaga
Be well

conrailthomas519

  • Crew
  • *
  • Posts: 343
  • Gender: Male
  • BNSF / Montana Rail Link
  • Respect: +13
Re: Weekend Update 1/5/25
« Reply #38 on: January 06, 2025, 06:35:32 AM »
+1
One could always throw in a bag of trash....or even a tire for that matter.
TMM

Jesse6669

  • Crew
  • *
  • Posts: 1103
  • Respect: +2812
Re: Weekend Update 1/5/25
« Reply #39 on: January 06, 2025, 10:13:29 AM »
0
.. a Santa fe 2-10-10-2
Models are looking good!  But man, that's some super steam power :o

haasmarc

  • Crew
  • *
  • Posts: 548
  • Gender: Male
  • Respect: +973
Re: Weekend Update 1/5/25
« Reply #40 on: January 06, 2025, 10:46:28 AM »
+13
I believe my foobie Baldwin Passenger Sharks were built from resin shells by Father Nature.

There is one other version of the BP20 in N scale.  Pete Peters made a master and I happen to get a couple shells from him.  They are not made from freight sharks and are correct in length.  I used stretched Con-Cor PA's for the mech.  This was a long time ago.  I have been wanting to repower them with a modern DCC/sound mech but haven't gotten around to it yet.  I did run them on the Reid Brother's Cumberland Valley layout which was a great thrill!

Sorry for the rough pic.


The shells would have been put on the market but a deal with Liberty Models to produce them fell through.

I would like to get some pictures of that O scale version's fuel tanks and battery box.  I have never been real happy with the ones I made and finding good proto pictures is hard because they are always in the shadows.

Marc Haas
Keeping the Reading alive in N scale!

draskouasshat

  • Crew
  • *
  • Posts: 1010
  • Gender: Male
  • Respect: +755
Re: Weekend Update 1/5/25
« Reply #41 on: January 06, 2025, 03:01:52 PM »
+7
Models are looking good!  But man, that's some super steam power :o

Thank you!  Just for anyone's info, I'm also working on the BP-20s for all of you SPFs!
Draskos Modelworks. Contact me for your 3D modeling needs!
SFM (Super Fleet Modeler) member #1
I HAVE 3800 class santa fe 2-10-2s!!

muktown128

  • Crew
  • *
  • Posts: 1031
  • Respect: +170
Re: Weekend Update 1/5/25
« Reply #42 on: January 06, 2025, 03:12:21 PM »
0
Thank you!  Just for anyone's info, I'm also working on the BP-20s for all of you SPFs!

THANK YOU

haasmarc

  • Crew
  • *
  • Posts: 548
  • Gender: Male
  • Respect: +973
Re: Weekend Update 1/5/25
« Reply #43 on: January 06, 2025, 04:00:44 PM »
0
Thank you!  Just for anyone's info, I'm also working on the BP-20s for all of you SPFs!

Looking forward to another BP20
Marc Haas
Keeping the Reading alive in N scale!

R L Smith

  • Crew
  • *
  • Posts: 812
  • Respect: +866
Re: Weekend Update 1/5/25
« Reply #44 on: January 06, 2025, 04:10:40 PM »
+7
More of a "quarterly update" rather than a Weekend Update.  :facepalm:

Back in early October, I held the first 'dry run' op session on the Southern Tier Lines.  While overall it went well, a few turnouts on the Erie's Rochester Branch in Bath caused some heartache for that operator, and we noted some dead frog issues too. I note that the suspect turnouts are all 25+ years old and are on their third layout, so this wasn't a surprise. (Insert "There's never time to do it right the first time, but always time to do it over" comment here.) While frog juicers are a straight-forward installation without any track work needed, they are prohibitively expensive for a layout this size.

So, I tore out 8 feet of track and 14 turnouts. Three needed replacement, but the others just needed connections to the frog, and I thought it would be easier to do that on the workbench. But what really drove that drastic step: I plan to eventually apply for an NMRA Merit Award for prototype modeling, and I needed to relocate some trackage to better reflect the Erie's trackage in Bath. So out it came.



I tried a few different attachment methods for adding the slide switch and associated wiring, and I haven't found a configuration that I truly like yet. But everything is back together and a sound-equipped S-2 now crawls through the reworked turnouts.  Good thing, as I am hosting my local NMRA Division on the 19th!   :scared:   After which, I may re-do a couple of them, and then move on to other turnouts that are showing intermittent problems.







Many thanks to mu26aeh for the miniature slide switches.

Ron
ELRRHS member. NMRA Mid-Central Region Division 11 Assistant Superintendent.

If the women don't find you handsome, make sure they find you handy...