0 Members and 1 Guest are viewing this topic.
I'm no signal expert but I think you'd need two more signals to do it "prototypical" -- there' be two facing "east", at the east-most switch points (on both mains), and two facing "west" at the other end at the points. If it's just to test them, then they are perfectly fine as-is!
The good news is I don't have to change anything right away. Fixing it now or fixing it later requires the same effort since they're already scenicked in. It's just another two big holes and two little holes, and then some wadded-up foam scraps to fill the old ones back in.However, noted. I probably should have surveyed more knowledgeable folks before I placed the signals, but ya live and learn. Fortunately for a prototype as enormous as Pennsy, E'd Law applies!
@Cory Rothlisberger is right though, if these are home signals for an interlocking, the placement makes little sense. That said, they actually operate as simulated block signals…they don’t indicate routing.I could move them. There’d be some trauma and some bullet holes in the benchwork, but it’s not impossible. I do need to do some cost/benefit before I move all four items (the signals and detectors) and would like to know where they would make the most sense to place, given that they operate as pseudo-block occupancy signals.
Wasn't trying to bust balls, was genuinely curious. RR's did some weird things. I sure as hell am no authority on signals. Looks good either way though!
You'll be glad when that one SPF fan at a train show harps at you for 30 minutes telling you the signals are placed wrong, after 900 other people have walked by and just admired. LOL
Dave, love what you're doing here. It's going to look fantastic when it's complete. Out of curiosity with those MTT signals , is it possible to remove the heads from their posts with the wiring remaining intact and mounting them on signal bridges? You might be able to SPF up a Bachmann signal bridge instead of going with something a bit more prototypical. However I totally get the fragility issue with signal bridges with a portable module. Nice work!
OK where did the model of Gallitzin station hiding in plain sight there on the left come from?