Author Topic: The New Northern Central  (Read 157549 times)

0 Members and 2 Guests are viewing this topic.

Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 26073
  • Head Kino
  • Respect: +11551
    • Conrail 1285
Re: The New Northern Central
« Reply #600 on: July 22, 2021, 09:52:40 AM »
0


Do they make a 4' version?  :D

Kidding aside, I actually have those for various curves. Don't know why I didn't get a straight one.

Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 26073
  • Head Kino
  • Respect: +11551
    • Conrail 1285
Re: The New Northern Central
« Reply #601 on: July 22, 2021, 09:58:46 AM »
+4
Took a break from futzing with track last night and decided to start mocking up some other scenes (because to make more linear progress I need to make sure everything works at this end).

So, I present the first draft of the Pershing Ave street running.

[ Guests cannot view attachments ]

[ Guests cannot view attachments ]

chuck geiger

  • Crew
  • *
  • Posts: 3565
  • Gender: Male
  • Train Talk Media
  • Respect: +3957
Re: The New Northern Central
« Reply #602 on: July 22, 2021, 11:26:39 AM »
0
This is looking great, we have close to the same benchwork now. I am keeping 1" foam
and not really going any thicker. I have no real topo changes on this project. Way easier
for fascia.

Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 26073
  • Head Kino
  • Respect: +11551
    • Conrail 1285
Re: The New Northern Central
« Reply #603 on: July 22, 2021, 11:43:24 AM »
0
This is looking great, we have close to the same benchwork now. I am keeping 1" foam
and not really going any thicker. I have no real topo changes on this project. Way easier
for fascia.

Agreed. I went with half on this layer for that reason. The lower will likely be 1".

Also, I have learned that cutting through two layers of 1" is more than twice as easy as one layer of 2".

Lemosteam

  • Crew
  • *
  • Posts: 6403
  • Gender: Male
  • PRR, The Standard Railroad of my World
  • Respect: +4817
Re: The New Northern Central
« Reply #604 on: July 22, 2021, 01:27:38 PM »
0


The reason I hate using cork.  No way the railhead would be as high as the beltline of that Ford Fairlane!
John "Lemosteam" LeMerise

Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 26073
  • Head Kino
  • Respect: +11551
    • Conrail 1285
Re: The New Northern Central
« Reply #605 on: July 22, 2021, 01:34:24 PM »
+1
The reason I hate using cork.  No way the railhead would be as high as the beltline of that Ford Fairlane!

Yeah, it's an issue, but I'll solve that problem easily with some foamcore (the way I did on Windsor St).

Worked out quite well.


davefoxx

  • Crew
  • *
  • Posts: 12338
  • Gender: Male
  • TRW Plaid Member
  • Respect: +8564
Re: The New Northern Central
« Reply #606 on: July 22, 2021, 02:36:31 PM »
+1
Even if Ed had laid the track right down on the foam (loud!), he still would have to build up the road to just shy of the railhead.  So foam core, more cork, etc. will work fine to raise the road.  As he pointed it out, it worked out really well on the Windsor Street layout, so I'm sure it'll be all good here, too.

DFF

A Proud HOer
BUY ALL THE TRAINS!
Still General Counsel to the Laurel Valley Ry.

garethashenden

  • Crew
  • *
  • Posts: 2327
  • Respect: +1820
Re: The New Northern Central
« Reply #607 on: July 22, 2021, 05:03:31 PM »
0
Another vote for the abandoned factory idea. Love some dereliction. Its easy to do badly, difficult to do well.

LIRR

  • Crew
  • *
  • Posts: 1285
  • Respect: +1806
Re: The New Northern Central
« Reply #608 on: July 23, 2021, 11:14:47 AM »
0
it's easier to raise the adjacent areas after the cork/track is down than it is lowering the track after the structures/scenery is complete...

OldEastRR

  • Crew
  • *
  • Posts: 3781
  • Gender: Male
  • Respect: +512
Re: The New Northern Central
« Reply #609 on: July 24, 2021, 07:39:57 AM »
0

So I hit on another idea... what about modeling it as an abandoned siding? Cut the track right there at the crossing, include the derelict mill building, etc... I think this has real possibilities.

The real area has inspiration for both options.

What do you guys think?


How about just the foundations left of the old building? That way you could not only have them of the main structure but also the foundations of smaller buildings and added-on wings for when production expanded-- giving you a bigger phantom footprint.  Maybe even have one of the smaller structures still standing, or part of one with an obviously new-brick wall where it used to attach to the main building. When those old factories wanted to increase output, they stuck on additions any old way to fit the need.

Look at the layout of this model I did for jdcolombo, based on a factory built in 1889 and added to for the next 50 years:



OR, you could fill the area with heavy forest vegetation -- fill that open space. I hear that if you do 3 trees a night you'll get it scenicked in no time.  :trollface:

Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 26073
  • Head Kino
  • Respect: +11551
    • Conrail 1285
Re: The New Northern Central
« Reply #610 on: July 26, 2021, 12:32:45 PM »
0
If it's worth doing once, it's worth doing again...

So I got started laying out the yard throat for the north end of Windsor St yard. One of the big problems I was thinking about, and that I had talked about before, was that there was no clearance for a northbound train (heading right to left) to make a pickup off of a yard track without asking for head room from the dispatcher. Everything was then going to be quite claustrophobic even with that since your power would disappear into the pit of staging pretty quickly (where there be dragons).

By switching this up like this, road trains coming down the runner (the top track that ties back in) can make pickups more easily from the yard (at least on the upper tracks). Instead of having 0" of head room, I'll now have 42" from the top track. That means that a smart yard master will use those tracks northbound pickups and set outs and crews will at least have a fighting chance.

This adjustment also gives me more room for a signal bridge for the interlocking and I like the visual of the mast signal for the track coming out of the yard the way it is in the new plan much better than it was before.

Of course, there were some trade offs. Four of them.
1. It meant having to remove an already installed (and powered) turnout.
2. I lose some track length in the bottom yard tracks, but I can live with that since they're already really long.
3. I now have an S curve coming into the bottom most yard track but I'm thinking that'll be a move that's barely ever made.
4. The north end of the REAL Windsor St yard is much more like the old plan than the new one. It was one of the few places where I had been actually replicating prototype track arrangements and that's now going out the window. But I figure what's one more finger in the eye of the prototype gods?



So what do you guys think of the modifications?
« Last Edit: July 26, 2021, 12:35:21 PM by Ed Kapuscinski »

Dave V

  • Crew
  • *
  • Posts: 12233
  • Gender: Male
  • Foothills Farm Studios -- Dave's Model Railroading
  • Respect: +11671
Re: The New Northern Central
« Reply #611 on: July 26, 2021, 12:50:01 PM »
0
Ed,

So rather than a wholesale change where runners are running down the ladder, why not keep the old, more prototypical plan and just add a crossover in the upper right between the running track and the ladder?  That way you have the functionality of both plans.
« Last Edit: July 26, 2021, 12:57:55 PM by Dave V »

Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 26073
  • Head Kino
  • Respect: +11551
    • Conrail 1285
Re: The New Northern Central
« Reply #612 on: July 26, 2021, 12:56:59 PM »
0
Ed,

So rather than a wholesale change where runners are running down the ladder, why not keep the old, more prototypical plan and just add a crossover in the upper right between the running track and the ladder?  That way you have the functionality of both plans.

Interesting thought.

The reason that immediately springs to mind is that it'll mean two more switches that really won't have much actual need. I can't picture what I'd use the "bypass" track for at this end of the yard since most of the work happens at the other end.

I'm ok with the aesthetic compromise for the improved simplicity.

Dave V

  • Crew
  • *
  • Posts: 12233
  • Gender: Male
  • Foothills Farm Studios -- Dave's Model Railroading
  • Respect: +11671
Re: The New Northern Central
« Reply #613 on: July 26, 2021, 12:58:20 PM »
0
I'm guessing in general you may regret having to send a through train into staging through 6 additional turnouts in the new plan.  Just a thought.

C855B

  • Crew
  • *
  • Posts: 11416
  • Respect: +2874
Re: The New Northern Central
« Reply #614 on: July 26, 2021, 01:06:57 PM »
0
... 3. I now have an S curve coming into the bottom most yard track but I'm thinking that'll be a move that's barely ever made. ...

I try not to make the assumption that any yard move is infrequent relative to the rest, especially for a track next to the main that is a potential impromptu "get out of the way!" pocket. That it's one of the longest doesn't help matters.

Unless I'm momentarily blind to another operation opportunity, it appears that most of what you're doing here is eliminating the bypass. Just shift the ladder to the bypass location and call 'er "done".
...mike

http://www.gibboncozadandwestern.com

Note: Images linked in my postings are on an HTTP server, not HTTPS. Enable "mixed content" in your browser to view.

There are over 1000 images on this server. Not changing anytime soon.