Author Topic: Challenge #5 - CCGC Maintenance Crossing  (Read 1429 times)

0 Members and 1 Guest are viewing this topic.

VonRyan

  • Crew
  • *
  • Posts: 3075
  • Gender: Male
  • Running on fumes
  • Respect: +597
Challenge #5 - CCGC Maintenance Crossing
« on: January 13, 2020, 10:31:43 PM »
+1
I’m going to use my same NGRM Online entry here, so if I botch the completion timing over there, I’ll still have a fighting chance here. But, since I did start this before Lee made it official I’ll subtract time from my TRW deadline accordingly if I don’t manage to meet the much earlier NGRM-Online deadline.

This is an 8” x 4’ module for my Cedar Creek Gravel Company On30 layout that also doubles as a photo plank.

Other than the striking curvature of the track, this module will feature typical southern NJ scrubland that is typically surrounding gravel pits. The scene will also incorporate a dirt crossing for maintenance vehicles to reach the pit, and either a small equipment repair building or company office.

As of today, trackwork is nearly complete with only two rails left to be laid, and of course a whole lot of spikes still needing to be put in.

The first image is for reference of my initial starting point.
The second image is of my progress as of today.

[ Guests cannot view attachments ]

[ Guests cannot view attachments ]
Cody W Fisher  —  Wandering soul from a bygone era.
Tired.
Fighting to reclaim shreds of the past.

VonRyan

  • Crew
  • *
  • Posts: 3075
  • Gender: Male
  • Running on fumes
  • Respect: +597
Re: Challenge #5 - CCGC Maintenance Crossing
« Reply #1 on: January 18, 2020, 07:56:39 PM »
0
As of last night all rails are in place. Now the module is ready for scenery to begin.

[ Guests cannot view attachments ]
Cody W Fisher  —  Wandering soul from a bygone era.
Tired.
Fighting to reclaim shreds of the past.

VonRyan

  • Crew
  • *
  • Posts: 3075
  • Gender: Male
  • Running on fumes
  • Respect: +597
Re: Challenge #5 - CCGC Maintenance Crossing
« Reply #2 on: January 30, 2020, 12:46:00 PM »
+1
Scenery is underway.

[ Guests cannot view attachments ]


Also working on planning a small scratchbuilt maintenance structure.
Cody W Fisher  —  Wandering soul from a bygone era.
Tired.
Fighting to reclaim shreds of the past.

VonRyan

  • Crew
  • *
  • Posts: 3075
  • Gender: Male
  • Running on fumes
  • Respect: +597
Re: Challenge #5 - CCGC Maintenance Crossing
« Reply #3 on: January 31, 2020, 01:41:18 AM »
+3
Scenery base layer is complete.

[ Guests cannot view attachments ]

[ Guests cannot view attachments ]

[ Guests cannot view attachments ]
Cody W Fisher  —  Wandering soul from a bygone era.
Tired.
Fighting to reclaim shreds of the past.