0 Members and 1 Guest are viewing this topic.
Oh Kato.....
"The remanufactured locomotives have a similar design to Metra’s F59 locomotives so Metra will be able to use the same parts inventory and won’t need different training and maintenance programs"
Not sure if it means internal components or external parts or both!!Jon
Over 4.5 million for a rebuilt unit, how much are the tier 4 twin engined MP54s that GO is buying?
The CADs I saw made it look like an SD70ACe, not a 70MAC
6.06m .... 97M for 16 units. (In 2017)~Ian
Rebuilt 20 year locos costing 77% of the price of a new one, seems high to me.
Plus, with the maintenance cost savings alone compared to their old locomotives it’s worth it. Then you factor in the fact that these rebuilt locomotives are going to require very little retraining and very little parts inventory adjustment and you get an even bigger savings
With the built in redundancy of twin prime movers, higher HP output (5400 vs 4000), newer technology that's tier 4 compliant are the savings really bigger?