Any idea about the arduous task of filling that hoist bucket over and over to lift all that coal up into the tower? How long did it take them to do this?
Dude, labor used to be CHEAP.Remember, they used to pay guys to watch grade crossings on branch lines.
I am also guessing there would be some sort of counterbalance to reduce the work load like in elevators.
OK, the engineer in me has busted loose, and I did some calcs for loading that coal bin. Guesstimating the lift distance from the picture, and assuming the bucket starts below grade to get filled with coal, I guess about 50’ of lift. So, a single ton of coal being lifted 50’ needs 100,000 foot-pounds of energy (assuming a 100% efficient lifting mechanism). One horsepower equals 550 foot-pounds per second. So, that makes it something like 200 horsepower-seconds to lift each ton of coal, assuming a 91% efficient use of the applied energy. Since a working man can put out only about 1/10 horsepower continuously, that becomes 2,000 manpower-seconds to lift a ton of coal. So, a single man turning a crank on a highly efficient bucket lift system would need 33 minutes and 20 seconds for each ton. Assuming an 8 hour work day, that is only 14.4 tons per day, assuming no breaks. So, a one-man operation would maybe load one modern tender per day by this method. Working day and night for 3 shifts per day would get maybe 3 tender loads per day.And, that assumes a continuous belt of bucket going up and down at the same time. This would be cut by more than half for a system with one bucket that needed to be lowered empty after each lift.I just don’t see the railroads settling for this kind of labor when they are really all about engineering a way use mechanical power to move bulk goods efficiently. It would be like the B&O giving men backpacks to get coal up Cranberry grade.
Max,The CPR had a number of small 40 Ton coaling towers throughout British Columbia and other parts of their "Western Lines". Many years ago, I had access to the CPR drawings for the 40 Ton coaling tower and redrew them in HO scale. However, the CPR is not my thing and I gave the drawings to a CPR modeller about 15 years ago - I am not sure I can remember who he was!Cheers,
Fifty-Ton Single Track Coaling Stations -- Canadian Railway & Marine World 1921: http://www.okthepk.ca/dataCprSiding/articles/201506/month00.htmThe article has a photo of a CPR tower in Guelph, Ontario, where CN also had a smallish tower.