moving ahead with track laying at the Fort St John yard
Nice to see progress on the other half of the Peace Division!
Installation of control panels for Chetwynd Yard is now underway with the first two now in place and operational. The work consists of installing the angled panel mounts, inserting the toggle switches into the control panels, installing the panels on their mounts, and then connecting the toggle leads to the Singlet servo controllers.
At bottom right, panel for the Imperial Oil spur:

Panel for the Canfor Ltd. mill trackage:

I also assembled a log loader for the Canfor mill. I installed the loader assembly in the raised position and articulated the clamp so that it can hold a log load in mid-air above the log sort:

I also completed a new batch of speaker enclosures for future sound installs:

Tim