0 Members and 1 Guest are viewing this topic.
What is that mangled metal just after the fence line? Kinda looks like a signal.
I'd wager to guess, speed will be the cause and I can't imagine why as it is the only curve on the line for miles and it is well signaled, including at the bridge approach.
That is a signal mast.I'd be really surprised if fatigue played any role in this as the location is only 1-1/2 hours South of the train's departure origin in Seattle.The trip to Portland is only just over 3 hours total.On Friday, the route was run over by dignitaries from Amtrak, the State of Washington and other local agencies.As I mentioned earlier, they have run test trains over this route for over 6 months, testing crossing horn and gate timing, matched with train speeds and I would assume for training of train crews.I've seen a myriad of track Geometry vehicles on the line, again as I've said, the bulk of this trackage parallels Interstate 5, on my route home, so it has been easy to see the amount of work and the location of it.The bulk of the work on the line was conducted under contract with Stacy & Witbeck as far as the WSDOT portion is concerned, which includes the portion where the accident occurred.Railworks did most of the Northern end under contract with Sound Transit.I'd wager to guess, speed will be the cause and I can't imagine why as it is the only curve on the line for miles and it is well signaled, including at the bridge approach.
I'm embarrassed to say that I've seen at least one nut job post claiming the "government is covering up what is actually an antifa terrorist attack because they're protesting fracking"...
An engineer isn't just thrown into a locomotive and told to run a train. They have to run a certain number of runs on a new to the crew member line unpaid(bnsf not sure on amtrak). Most likely this is a human error accident where he just got complacent.
As for the train, what I understand from people who worked on the tests is that the only test trains they ran were during the unusually dry summer we had, with trains that had very few people on board. The SOP they developed for southbound trains is to do an air dump when passing under the Center street exit overpass, which put those trains in a good speed for that curve. This train yesterday was mostly full and ran in very wet weather (as far as I know, they ran no Cascades tests on wet rails earlier this year). If the head end did the air dump like they were supposed to, the engineer might not be at fault for what happened next.
UNPAID wow . Wouldn't that during the LEARNING CURVE make him legally a non employee ? Isn't that illegal ? Sounds like a catch 22 of sorts .
4 ... Could be that at 80 MPH the speed of 30 , if marked at all was positioned way to close to the bridge to slow down .