0 Members and 1 Guest are viewing this topic.
Time to stop lurking and post what I am working on. The Grand Trunk Southern is operational and I am starting to move from plywood central to some scenery. Started with home made backdrops and the scenery behind the tracks. Here are some examples showing a pair of GTS SD45's on a manifest freight moving through Nathanville. ...
More shingling...3 of the 4 main roof panels on the Nelson station are done but not glued down. I am figuring out then test fitting the dormer and bay roofs as I go.Once complete the entire roof will be faded and weathered.have a great weekend!md
I had a leftover bridge beam that made a perfect load for the G33 gon. The Bethlehem sign is copied from signs seen in the PRR gon book.
Time to stop lurking and post what I am working on. The Grand Trunk Southern is operational and I am starting to move from plywood central to some scenery. Started with home made backdrops and the scenery behind the tracks. Here are some examples showing a pair of GTS SD45's on a manifest freight moving through Nathanville.