0 Members and 1 Guest are viewing this topic.
... Confirms the color of the horizontal walkway surface on the bump-ups near the end.
Mike: I don't know about the trailing unit, but the SP&S had good luck with their C636s. Unless the C630s were much different, they should have at least been reliable.
...it took EMD awhile to deliver all the 6900s. [W]hen was the last 6900 delivered compared to the last U50C?...
{I} think that the date that You show for 5039 is wrong. The last U50C was delivered between 12/70 and 2/71. ... As soon as I can get to my X2200 South roster I'll post the dates shown by X2200.