A quick update. I am finding the shimming the bottom of the frog with Evergreen styrene is working very well on Peco Electrofrog turnouts. Using 0.010" thick material. Testing with a train of BLMA gons and I shove back and forth all day without a derailment (well maybe 8-10 times, till I get tired).Also doing the guard rails with the same material. Maybe I won't sell the "narrow tread" wheels I had set aside after all.Bill Kepner
It seems there is some variation of how much gap there is at the guard rail. In one case, an 0.010" shim was too thick. I think the NMRA standards call for a 0.028" gap, in some cases it looks like out of the box, the distance could be 0.034". I went looking for something I could open up the gap some. "Needle files" appear to be too thick (at least for those I found that actually specified how thick they are; those in the MicroMark catalog do not ).I found a hacksaw blade, specifically a worn hacksaw blade is about right. I also need to hunt down the set of clearance gauges I once had for setting the valves on my BSA, to be able to check width of the gaps.Its funny how when you start looking at a problem like this, some suggestions from the community and a bit of experimentation turns up a good process. Now it doesn't seem like rocket science like it did when I started this thread.Thanks all.Bill Kepner
I somehow had a different image in my mind
It's always fun seeing topics like this because many have strong opinions. It's just like the last time I was in my LHS picking up track and one of the older employees was explaining to me that no one uses code 55 because it's so unreliable and how code 80 is the only way to go, lol.
I don't understand how the height of the rail somehow relates to the track reliability. The wheels only contact the rail-head, regardless whether the rail is 40 thousandths or 80 thousandths high.
Rail height is relevant on one point and that is the depth of the wheel flange. When we started building the layout (1981) MT pizza cutters were the norm and many engines still had deep flanges (Rapido engines were more than 40 thousands). When we tried flex track there were many cars and engines that bounced on the simulated track nails. This was not a pretty sight.Soldering to PC ties was the solution, only Rapido equipment still had problems. Of course, we still fail the ball peen hammer and anvil test, but we are looking into it.Marty YoungSan Diego, CA