Craig, I bet the answer is simple: an earlier iteration of the bridge was the multi-span plate girder with steel towers. When the road underneath was widened, the towers were in the way and a much longer span was required. Rather then building a new bridge, the Pratt truss was an ingenious way to span the roadway while supporting the pre-existing deck above. As to who decides, most of the time the design is driven purely by engineering considerations and cost, and in most instances, the selection of a steel bridge type is a nobrainer. Surprisingly, Auburn has two other bridges that are even more interesting than this one; if you like bridges, check out Bridgehunter.com, a great site.Otto K.