0 Members and 1 Guest are viewing this topic.
What's your idea of "finishing?" Something like drywall-finished walls and ceiling or with a suspended system to reasonably match other parts of the house or are you making it look not so stark (you'll still going to know you're in a basement)? Your ceiling looks sort of low, and trying to frame a soffit or box for that beam will leave a potential clearance issue (this may be one of those places for a "theatrical-style black paint job on the joists, beam, etc and make things "disappear"). Some would say move the sewer line between the joists but that is expensive and I can see that you have other stuff in the way to get over the steel beam. For the best look, a framed out wall in front with maybe some slight notches (don't want to introduce too much weakness) . For your your cleanout , I think framing out an space is best, but instead of a closet you could just put a access door/hatch in and that would preserve access, require no modifications if you move, and limit the footprint. Alternatively, where the pipe is you could just paint everything a common color or partially frame the layout area with furring strips up to the pipe to support a backdrop (this is where the degree of finish comes in). You could always have the backdrop attached to the layout itself to more of less block the pipe view if you just painted the wall. Maybe the layout area is in more of a mechanical space (as you mentioned moving the WH to fit the N layout) so its more of paint and basic treatments and you finish the rest of the basement off more as living space.
Put the ceiling in first. Attach the metal L pieces direct to the studs. Then 4x8 hardboard up against the metal grid. Fill in the lower area with drywall.You can also screw into the studs like a big shelf bracket to support the layout.
Awesome, Dave! I'm holding off on any further track purchases for my HOn3 venture pending my move in April.As for your basement finish, is there an appreciable chance you may find yourself selling that house in the next few years? I would just caution that in that case the mods you make shouldn't be too extreme or too model-railroad specific. Any changes you make that would not appeal to your average buyer should be easy to revert.
In the history of Furlow project railroads, I think the only one that actually fit the advertised space was the Carbondale Central because it used all sectional track.
One other observation... As I'm track planning in HOn3 with an 18-19" minimum radius, I'm still disoriented by how much space turnouts take up in larger scales. An On30 #5 takes up even more space I would assume.
You can print out Fast tracks On30 templates:http://www.handlaidtrack.com/assets/downloads/tt-on30-t-5.pdf
There was also that article in MRP about the Furlow G trackplan mods. I think they just added a run-around track.
If you think turnouts are big wait till you start structures
There wasn't much changed:
With such a small layout (for O scale) I would skip the standard gauge and 3-rail.I got a bunch of hits on the NG&SLG DVD if you need any plans. Just printed out their coal car plans
Awesome! I found an ET&WNC documentary on YouTube. I know what I'm going to be doing for the next forty-five minutes or so.Enjoy!DFFEDIT: Another ET&WNC video! The first is the WWII years, this second video is the final years (around 1949-50):