0 Members and 1 Guest are viewing this topic.
...Based on my previous experience with other brands, I'd probably go with Unitrack. I hate how it looks, but it's darn good-running, reliable track and it's made of a great metal that seems to stay very clean.
John,I haven't built my staging yet but Unitrack is the way I'm going to go. I was a member of a club that folded some years ago but we used Atlas C55 everywhere and went with Unitrack in the staging yards. We found that the Unitrack matched up very well with the Atlas C55 on Mid-West cork and using the Kato track joiners flattened and soldered to the bottom of the C55 track.Jon
I also used Peco code 55, and mated it to the ME code 55 by filing the extra off the bottom of the Peco rail. I only had one track I had to join, so filing two rails was easy, and standard ME rail joiners worked fine. Atlas code 55 wasn't available yet, but it should work the same. And, like Lee, I used the Peco motors, with their auxiliary contacts added, for positive power routing.I did have to shim the guard rails, a common issue with Peco turnouts and modern wheels, but a strip of Evergreen styrene glued to the inside of each one solved that problem. use your NMRA gauge to determine the thickness you need, I used 0.060 wide strips, and sanded any excess so the tops were smooth.