0 Members and 1 Guest are viewing this topic.
Tim: honestly I don't understand the problems Chris is facing. md
I'm pretty sure it's either a short due to incorrect gap placement, and/or a dead section due to incorrect feeder placement. In my response above, I did not make feeder requirements very clear: they need to be on the point side of the turnout where the polarity of both rails is fixed.Tim, the Atlas turnouts are wired differently: all rails have fixed polarity except the frog, so you use them more like "normal" track. On the Pecos, the frog rails extend all the way out to the end of both routes, so care needs to be taken with those switched-polarity rails when joining them to adjacent track. Not so with Atlas. Of course, you need to supply switched power to the Atlas frog if you want it to be live.
Maybe I'm hyper-sensitive about this. But of all the things that drive me mad about running my layout (besides having to make trees), stalling and cleaning track are at the top of the list. It makes running trains so much less fun. The lovely little train is gliding along and then... and then... stall.. and in an instant the illusion is shattered and "fun time" becomes "cleaning time".
All six rails leaving the turnout are fed from adjacent track. I wanted to have the turnouts removable and replaceable in the event of failure, which becomes more difficult as one solders additional wires to the turnout. I will monitor the first four I have installed and see if I need to implement any of the precautions which others have suggested here.
Easy way to power frogs.
But there's very little light under my layout.