0 Members and 1 Guest are viewing this topic.
Battle has been joined on the second module; the Domtar Packaging Containerboard mill module. Here's a rough drawing and some notes to get things started:
Since you are making a large industrial plant you might think about having a complex of tall buildings/structures on the right side of this section, to avoid the "cliff out of nowhere". Your main can go through a ROW between two big buildings to leave this scene and come out of the tunnel on the other side. A piping bridge or linking passageway between the buildings would help hide the tunnel. The back side of the cliffs on the other side can become a big flat backdrop with whatever scene fits the location: industrial area, town, low hills with sky and clouds, etc. This would also give you more shipping and tail track on that side.I forget which MR staff member has the layout with a paper mill against a backdrop and a different scene on the other side. But that shows how it can be done. BTW, are you going to post this drawing and pix to your layout construction thread? Didn't see it so I posted reply here.
Wrapped this up a week or so ago....I took the recently released Atlas 40' Steel Rebuild and made a couple of changes to bring it a little closer to the prototype. Mainly the roof, roof walk and doors.
Fox Valley N Scale FMC 5347. Weathered with cheap craft paint, oil wash and powders. Dullcote at the appropriate steps. Cut down the bolsters to lower ride height. Body mount couplers, FVM 33" metal wheels, Added lift levers and hoses.Craig