Author Topic: Weekend Update 12/25/15  (Read 10887 times)

0 Members and 1 Guest are viewing this topic.

up1950s

  • Crew
  • *
  • Posts: 9959
  • Gender: Male
  • Respect: +2875
Weekend Update 12/25/15
« on: December 25, 2015, 07:26:08 PM »
+1


Richie Dost

C855B

  • Crew
  • *
  • Posts: 11422
  • Respect: +2885
Re: Weekend Update 12/25/15
« Reply #1 on: December 25, 2015, 07:48:47 PM »
0
Made me laugh out loud, Richie. Very Monty Python-esque.
...mike

http://www.gibboncozadandwestern.com

Note: Images linked in my postings are on an HTTP server, not HTTPS. Enable "mixed content" in your browser to view.

There are over 1000 images on this server. Not changing anytime soon.

Iain

  • Crew
  • *
  • Posts: 4887
  • Gender: Female
  • Na sgrìobhaidh a Iain
  • Respect: +833
    • The Best Puppers
Re: Weekend Update 12/25/15
« Reply #2 on: December 25, 2015, 09:02:35 PM »
0
At first I thought that said No Train Porn.   :ashat:
I like ducks



C855B

  • Crew
  • *
  • Posts: 11422
  • Respect: +2885
Re: Weekend Update 12/25/15
« Reply #3 on: December 25, 2015, 09:10:07 PM »
0
OK, I'll go. Posted in the engineering thread, the genuine, honest-to-gosh start of my actual model railroad layout. It would be further along, but I ran out of rivets after the hardware store closed early yesterday. Benchwork framing:

...mike

http://www.gibboncozadandwestern.com

Note: Images linked in my postings are on an HTTP server, not HTTPS. Enable "mixed content" in your browser to view.

There are over 1000 images on this server. Not changing anytime soon.

basementcalling

  • Crew
  • *
  • Posts: 3922
  • Gender: Male
  • Respect: +1056
Re: Weekend Update 12/25/15
« Reply #4 on: December 25, 2015, 09:29:45 PM »
0
OK, I'll go. Posted in the engineering thread, the genuine, honest-to-gosh start of my actual model railroad layout. It would be further along, but I ran out of rivets after the hardware store closed early yesterday. Benchwork framing:



Well, you also bought and refurbished a large building, crew quarters, and demolished a crack house. Those did take a few hours of your time that could have been spent on layout construction, but running out of rivets? Poor planning.  :scared:
Peter Pfotenhauer

John

  • Administrator
  • Crew
  • *****
  • Posts: 14003
  • Respect: +4179
Re: Weekend Update 12/25/15
« Reply #5 on: December 25, 2015, 09:39:58 PM »
0
OK, I'll go. Posted in the engineering thread, the genuine, honest-to-gosh start of my actual model railroad layout. It would be further along, but I ran out of rivets after the hardware store closed early yesterday. Benchwork framing:



that's why you should always count your rivets :) .. . I couldn't resist :)

C855B

  • Crew
  • *
  • Posts: 11422
  • Respect: +2885
Re: Weekend Update 12/25/15
« Reply #6 on: December 25, 2015, 09:43:28 PM »
0
Nyuk nyuk. Oh, I thought there were enough (a mostly-full previously opened box of 100) to make it through Christmas Eve, etc., but it moved along much faster than I figured. Which is a good thing. The "poor planning" aspect was underestimating just how many I would use per crossmember, or that in subsequent overengineering I was vastly increasing rivet count. In that view are 66 rivets, and I know I wasted at least 10-15 in a couple of failed experiments. Trust me, two more boxes in the morning, then replenishment thereafter when the first box is emptied.

that's why you should always count your rivets :) .. . I couldn't resist :)

[...sigh...]
...mike

http://www.gibboncozadandwestern.com

Note: Images linked in my postings are on an HTTP server, not HTTPS. Enable "mixed content" in your browser to view.

There are over 1000 images on this server. Not changing anytime soon.

Catt

  • Crew
  • *
  • Posts: 1721
  • Gender: Male
  • Respect: +28
    • Boylerwerx
Re: Weekend Update 12/25/15
« Reply #7 on: December 25, 2015, 10:11:06 PM »
0
Sometimes being a rivet counter is a good thing.  :D
Johnathan (Catt) Edwards
Sole owner of the
Grande Valley Railway
100% Michigan made

up1950s

  • Crew
  • *
  • Posts: 9959
  • Gender: Male
  • Respect: +2875
Re: Weekend Update 12/25/15
« Reply #8 on: December 25, 2015, 10:12:11 PM »
0
So say you need to mount a switch machine right where a cross beam is . That has happened to me many times on my old L girder HO layout . With sheet metal screws the cross bracket can be de-screwed , with rivets you're screwed .


Richie Dost

Iain

  • Crew
  • *
  • Posts: 4887
  • Gender: Female
  • Na sgrìobhaidh a Iain
  • Respect: +833
    • The Best Puppers
Re: Weekend Update 12/25/15
« Reply #9 on: December 25, 2015, 10:41:24 PM »
0

Ready for the paint shop:




So, I started another:



Two foot fever's hitting me real hard!
I like ducks



C855B

  • Crew
  • *
  • Posts: 11422
  • Respect: +2885
Re: Weekend Update 12/25/15
« Reply #10 on: December 25, 2015, 11:07:46 PM »
0
So say you need to mount a switch machine right where a cross beam is . That has happened to me many times on my old L girder HO layout . With sheet metal screws the cross bracket can be de-screwed , with rivets you're screwed .

Not really. It's very easy to remove a rivet, just drill it out. Do it all the time. If the top of the rivet is concealed by table top material, then take a Dremel to the bottom of it. We're talking so-called "pop" rivets here. I don't like sheet metal screws - although I do use them in select locations - because they result in "sharp little pointy things" in places you will, someday, go to grab. Ouch.

As far as switch machines go - and mindful that some of my crossbeams cannot be moved because they are gusseted to a wall stud - I have designed a top-mounted switch machine solution. Or, rather, a mounting clip for a micro-servo attached directly under the turnout. Prototype should be back from Shapeways in a couple of days, so I'll know more then.
...mike

http://www.gibboncozadandwestern.com

Note: Images linked in my postings are on an HTTP server, not HTTPS. Enable "mixed content" in your browser to view.

There are over 1000 images on this server. Not changing anytime soon.

M.C. Fujiwara

  • Crew
  • *
  • Posts: 1344
  • Respect: +84
    • Silicon Valley Free-moN
Re: Weekend Update 12/25/15
« Reply #11 on: December 25, 2015, 11:22:30 PM »
+1
Finished replacing all the Caboose Industries ground throws with SparkFun (& 1 AdaFruit) slide switch.
All frogs are POWERED!!



Just some ground cover scenicking, & we'll have some lovely switching to shoot in the sunshine:



More in the Layout Engineering thread.

Happy Holidays, everyone!
M.C. Fujiwara

Chris333

  • Crew
  • *
  • Posts: 19594
  • Respect: +6911
Re: Weekend Update 12/25/15
« Reply #12 on: December 25, 2015, 11:40:39 PM »
0




I'm sure you know real 2 foot stake pockets will fit inside of those Grandt Line ones. You can get correct sized ones here:
https://www.shapeways.com/designer/hon2jeff

tehachapifan

  • Crew
  • *
  • Posts: 3477
  • Respect: +1148
Re: Weekend Update 12/25/15
« Reply #13 on: December 26, 2015, 12:43:38 AM »
+1
Installed another MRC 1909 diesel "Sounder" in a second SP Bay Window caboose. This time a Rivarossi bay window yet to be detailed and repainted....


The huge speaker supplied with the MRC sounder was replaced with a smaller, oval speaker and a baffle was scratch-built out of styrene.


SBS4DCC wheel wipers were used with BLMA wheels and MT trucks.



The SP seemed to drag a caboose around on a lot of locals and often attached to the engine ahead of cars, so this is a pretty good sound option for me. The MRC decoder has a very decent sounding EMD 645 non-turbo file selection and great sounding and loud horn options. My only (minor) complaint with this sound decoder is the periodic compressor sound preempts the ring-out/echo of the horn.

« Last Edit: December 26, 2015, 12:57:39 AM by tehachapifan »

Chris333

  • Crew
  • *
  • Posts: 19594
  • Respect: +6911
Re: Weekend Update 12/25/15
« Reply #14 on: December 26, 2015, 02:15:33 AM »
+6
I used my lathe and mill today  :D   Made steam and sand domes. First I used an end mill to round the bottom of the domes. Then chucked it in the lathe. Spot drilled and threaded a hole for mounting. To turn the sides I used one of Max's ideas and cut the profile in the tool. So both domes are a different dia., but have the same profile.

They ARE NOT mounted to the correct sized tube. They fit the correct tube.

Then I needed a whistle and pop valves. I have a brass kit with perfect sized ones, but didn't want to robb the kit of them. So I tried to copy on the lathe. Have to use a magnifying glass to see the edge of the cutter  :scared:  After I noticed I need 2 pop valves and remade those as seen above.

The brighter parts are mine. Took about 3-4 hours for all this and my mistakes  :facepalm: