Seems to me that when things reach this point, it may be better in the log run to start with hand-built turnouts.
Trouble is, the initial time investment is huge compared to RTR. I think the best option is hybrid 'optimized' RTR. That eliminates maybe 80% of the time and gets you almost 100% of the benefits of hand built.
As far as a "huge" expenditure of time is concerned...it doesn't exist.
Where did you get a hold of your time-stopping-device? I agree, it's not complicated. But it absolutely takes a lot of time. Some people here are talking between 120-300 turnouts on their layout. Averaged at about 45 minutes per turnout, that's the equivalent of two to five and a half WEEKS at 40 hours/week doing nothing but building turnouts. A modest 50 turnouts is just about one 40 hour week, 8 hours a day. It would only take about 10 minutes to open that many turnout packages.
Some people here are talking between 120-300 turnouts on their layout. Averaged at about 45 minutes per turnout, that's the equivalent of two to five and a half WEEKS at 40 hours/week doing nothing but building turnouts. A modest 50 turnouts is just about one 40 hour week, 8 hours a day. It would only take about 10 minutes to open that many turnout packages.
Wow! I never realised there could be so many problems with RTR turnouts! Makes me glad I've always stuck with Peco electrofrog.I've got a couple hundred on my main layout (code 80) and over half are thirty years old, have been reused on several layouts, survived house moves etc, and the only maintenance is cleaning contacts, I don't even bother to wire feeds to the frogs! The code 55s on my newer N&W layout are equally bullet prof, despite being on their second layout.As for 'plating' wearing off due to track cleaning ... Peco only use solid nickle silver, no issues there, but it sounds like you should invest in an HF track cleaner and forget manual cleaning.Cheers,Kev
I just replace the point and closure rails completely as one solid rail and reinforce the frog lead as necessary.This could be done on a laid/ballasted turnout quite easily. The hardest part would be replacing a few ties with PC boards, but a tool like Robert made would make it pretty straight forward.