0 Members and 1 Guest are viewing this topic.
More final assembly of the bridge and the first ballast is in place.
This weekend, I managed something that's been on the to-do list for a very long time: I've made a start on my first layout.Crappy smartphone pic doesn't hide nearly enough of the crappy construction, track alignment, etc but the whole idea of this 2x4 beastie is to get some practice before attempting an around-the-walls monster.Looking forward to making ore progress next weekend!Stu
That's 2 x 4? Looks more like 3 x 4. Or even 4 x 4.
[image]http://s62.photobucket.com/user/as142/media/Buick051_zps45ba977c.jpg.html?sort=3&o=0[/img]
Anyone care to take a guess as to what this is?
Did you etch those unique handrails as well with their diagonal braces? Every single one the Erie owned was used in my area.http://www.rr-fallenflags.org/el/loco/lima.html
I did the version B&O owned, which had fairly typical handrails. There were a few other differences between it and the ones Erie had.
Finally finished this insulated boxcar, only took me 7-8 years. At this rate, well not sure if I'll ever finish anything.Car was an experimental composite insulated car. Only two built for BN, now in MoW bridge building crew service.
I have one of these as well .. your car turned out better .. good job