Up to date product status information is here:http://www.atlasrr.com/ordership.htm
That info is useless more often than not. Last time I checked first quarter is over and I would hope Atlas knew that all the 1st quarter items would be 2nd quarter, if we are lucky.
No word yet on the S2s - the sound decoder is the hold up. As far as the schedule, as we get updated information from the factories, the schedule is updated. The rolling stock schedule is holding up pretty well, the locomotive schedule is still a little hit or miss. The factories are still learning the production of our locomotives (mold set ups, tolerances, etc.) which is why it is taking a little bit longer than expected on some items.
Agreed. As confirmed by Paul, that is the page where the information is updated as they get updates from the factories.If there is no March container report, it stands to reason that there was no container shipped in March. It's not set in stone that containers ship monthly.
I figured the S-2 sound decoder was going to be a significant engineering project. But I'm happy to wait for it to be right - ESU's 539T sound file is magical. And please don't get frustrated by the delay - this is pioneering work by Atlas AND ESU LokSound. I look forward to the not-too-distant future day when I can order ALL my steam locos and diesels with a sound option. The S-2 is the pioneer test bed for diesel sound installs, because if it can be done well in this size of loco, it can be done well in anything.John C.