The Coast Starlight is not part of the discussion. It doesn't serve densely populated areas along most of its route. We are talking principally about Caltrain, Metrolink, and the Capitol Corridor and San Joaquin. Also potentially the San Diego lines, but that would come later.
To take this as an example, it would not be entirely pointless to electrify the existing metrolink line from Lancaster to LAUPT, along with alignment improvements to allow higher speeds (but not necessarily 'high-speed' travel) as an interim to building a true high speed line through Soledad Canyon and into LA. Let's say maybe the Metrolink travel time from LA to Lancaster could be cut from 2 hours to an 1hour 15 minutes (but not the half hour they claim for high speed trains). Such a project could serve as the interim connection for high-speed trainsets, but also provide a long term improvement for Metrolink's Valley line even if the Tehachapi connection never gets built. The entire current alignment would be left intact for UP freights.
That scheduling was a change that was made relatively recently, probably because the HSR authority received quite a bit of feedback similar to mine.
And my point is that the political will is not going to be there if they don't make good connections between the Central Valley chunk and other existing lines. Basically what they need(ed) to do is electrify the remaining part of the San Joaquin route from Merced to Oakland so that the same trainset could run from Bakersfield to Oakland in up to 2 hours less time.
Forget the Tehachapi part until such time as you have demonstrated that these projects can improve transit options and start paying for themselves before the most expensive and risky investments need to be made.
Strangely enough, I don't disagree with much you say.
Fundamentally, though, that stretch of track near Tehachapi is the one thing that will really improve the travel times, but it also will cost more that any other segment of the system. The problem we have now is that state and federal money has been allocated to pay initial costs for SF to LA HSR, and the money just isn't there yet to start tunneling through mountains.
They have to start somewhere, and they legally can't get away with spending all of it to benefit LA and SF area commuters...
The current plan for the initial operating segment between Merced and Bakersfield is precisely that, to provide improved travel times by rerouting the San Joaquin to the new tracks so it can run at higher speeds (still using diesel power) and without conflicting freight traffic. Electrification on the Central Valley segment comes later, in any case, as it's pretty much an all or nothing thing.
If they get 3,000 riders a day, every day, that's a million a year so that's $1,000 per ticket.
And if that's not bad enough, this for a state that is broke.
But maybe they are just planning on somebody else paying for it (like me in Michigan).
So you're saying the money is not the biggest challenge?
Even the vaunted NEC cannot make a profit when you factor in the capital costs of running the operation. At least that's what Trains magazine said about the NEC (does it or doesn't it make a profit) a few months back.
BTW, the annual ridership according to Amtrak in California for FY 2011 is:Pacific Surfliner service (San Diego-Los Angeles-San Luis Obispo, 2,786,972)Capitol Corridor service (San Jose-Oakland-Sacramento-Auburn, 1,708,618)San Joaquin service (Oakland/Sacramento-Bakersfield, 977,834)Per Amtrak.
This is all before you consider what their fair share of the damage caused by the CO2 they emit should be, or the bloated military necessary to make sure the oil still flows.
The real question here is whether we want to invest in a more convenient and comfortable future, or just keep limping along with our current neglected and deteriorating infrastructure.
There's the crux of the issue here... some believe the first step should be to fix the current neglected and deteriorating rail infrastructures that provide more benefits to all users (freight, passenger, commuter) in a more expedient manner... not build brand new ones that serve little purpose until the whole new infrastructure is in place. I find this all interesting... I live in Virginia, and we're doing the above approach, before diving into an all out HSR approach.