Author Topic: Weekend Update 2012/09/09  (Read 11677 times)

0 Members and 1 Guest are viewing this topic.

up1950s

  • Crew
  • *
  • Posts: 9680
  • Gender: Male
  • Respect: +2098
Weekend Update 2012/09/09
« on: September 07, 2012, 07:31:08 PM »
0

 
UP 819 progress
 

 
« Last Edit: May 18, 2021, 02:58:42 PM by GaryHinshaw »


Richie Dost

superturbine

  • Crew
  • *
  • Posts: 909
  • Gender: Male
  • Respect: +62
Re: Weekend Update 9/9/12
« Reply #1 on: September 07, 2012, 09:58:33 PM »
0
Lookin good... Show the shot of your cab doors.

VonRyan

  • Crew
  • *
  • Posts: 3075
  • Gender: Male
  • Running on fumes
  • Respect: +597
Re: Weekend Update 9/9/12
« Reply #2 on: September 07, 2012, 10:52:41 PM »
0
Coming along nicely i see. Perhaps by 2020 you'll have built the whole UP steam fleet.  :trollface: :trollface: :trollface:

Cheers!  :D
-Cody F.
Cody W Fisher  —  Wandering soul from a bygone era.
Tired.
Fighting to reclaim shreds of the past.

up1950s

  • Crew
  • *
  • Posts: 9680
  • Gender: Male
  • Respect: +2098
Re: Weekend Update 9/9/12
« Reply #3 on: September 07, 2012, 11:36:25 PM »
0
Lookin good... Show the shot of your cab doors.

Thanks .There have already been changes and additions back there in the last 2 days , but this was Wednesdays shot .



Richie Dost

Catt

  • Crew
  • *
  • Posts: 1721
  • Gender: Male
  • Respect: +28
    • Boylerwerx
Re: Weekend Update 9/9/12
« Reply #4 on: September 07, 2012, 11:37:33 PM »
0
Small update,got some much needed work done to the right end of the Grain elevator complex.By the way it is now known as the Gorman Grain Co.Some of the other N scalers here know who Dick Gorman is i am sure.



Some quick details,the elevator is almost 36" long and except for the loading shed is scratchbuilt. The office and garage is a painted and mildly modified Walther's Stateline Farm supply.The warehouse is a Micro-Engineering building.It will either get repainted to match the office or replaced with a Pikestuff building.
Johnathan (Catt) Edwards
Sole owner of the
Grande Valley Railway
100% Michigan made

up1950s

  • Crew
  • *
  • Posts: 9680
  • Gender: Male
  • Respect: +2098
Re: Weekend Update 9/9/12
« Reply #5 on: September 07, 2012, 11:40:23 PM »
0
Coming along nicely i see. Perhaps by 2020 you'll have built the whole UP steam fleet.  :trollface: :trollface: :trollface:

Cheers!  :D
-Cody F.

Thanks Cody . Now that's a target to live for , but a 4-12-2 and a 4-10-2 might be beyond my abilities .


Richie Dost

superturbine

  • Crew
  • *
  • Posts: 909
  • Gender: Male
  • Respect: +62
Re: Weekend Update 9/9/12
« Reply #6 on: September 08, 2012, 12:01:24 AM »
0
Now that's a target to live for , but a 4-12-2 and a 4-10-2 might be beyond my abilities .

Not me, I built the 3800 class 2-10-2 to figure out the frame mods needed to build a 4-12-2.  I've been a little delayed over the last year but, frame parts for this beast were cast tonight, boiler is 60% done. The engine is building upon the work done my Adam aka Drasko. Glad I have large raduis curves!! :scared:
« Last Edit: September 08, 2012, 09:14:54 AM by superturbine »

seusscaboose

  • The Pitt
  • Crew
  • *
  • Posts: 2045
  • Respect: +190
Re: Weekend Update 9/9/12
« Reply #7 on: September 08, 2012, 12:02:15 AM »
0
Ritchie,
Extra Bonus Points for the Header this week.

I found these 2 old Polaroid's


"I have a train full of basements"

NKPH&TS #3589

Inspiration at:
http://nkphts.org/modelersnotebook

up1950s

  • Crew
  • *
  • Posts: 9680
  • Gender: Male
  • Respect: +2098
Re: Weekend Update 9/9/12
« Reply #8 on: September 08, 2012, 01:33:44 AM »
0
Not me, I built the 3800 class 2-10-2 to figure out the frame mods needed to build a 4-12-2.  I've been a little delayed over the last year but, frame parts for this beast were cast tonight, boiler is 60% done.  Glad I have large raduis curves!! :scared:


Is that your UP class ? That looks too good to be N , even from a manufacturer . If you made that model your 50 times better that I thought , which was exceptional .


Richie Dost

jsoflo

  • Crew
  • *
  • Posts: 218
  • Respect: +23
Re: Weekend Update 9/9/12
« Reply #9 on: September 08, 2012, 07:59:57 AM »
0
Small update,got some much needed work done to the right end of the Grain elevator complex.By the way it is now known as the Gorman Grain Co.Some of the other N scalers here know who Dick Gorman is i am sure.



Some quick details,the elevator is almost 36" long and except for the loading shed is scratchbuilt. The office and garage is a painted and mildly modified Walther's Stateline Farm supply.The warehouse is a Micro-Engineering building.It will either get repainted to match the office or replaced with a Pikestuff building.

That is one helluva grain elevator, very well done, reminds me of one I used to see on trips to Milwaukee.

superturbine

  • Crew
  • *
  • Posts: 909
  • Gender: Male
  • Respect: +62
Re: Weekend Update 9/9/12
« Reply #10 on: September 08, 2012, 08:05:35 AM »
0
I wish!!!  I am likely not even as good what you thought. :D
It's the HO model I bought for making measurements and making parts.
« Last Edit: September 08, 2012, 01:24:54 PM by superturbine »

Kisatchie

  • Crew
  • *
  • Posts: 4180
  • Gender: Male
  • Respect: +62
Re: Weekend Update 9/9/12
« Reply #11 on: September 08, 2012, 09:50:11 AM »
0
I made some good progress assembling my Intermountain reefer kits. About 10 days or so ago, I had 38 left to build. Right now, I have 14 to go. :)


Hmm... don't tell Kiz he
has 48 Intermountain tank
car kits left to finish...


Two scientists create a teleportation ray, and they try it out on a cricket. They put the cricket on one of the two teleportation pads in the room, and they turn the ray on.
The cricket jumps across the room onto the other pad.
"It works! It works!"

Puddington

  • Crew
  • *
  • Posts: 3874
  • Gender: Male
  • Modelling is the best medicine for what ails me.
  • Respect: +245
    • The Canadian Pacific Railway's Dominion
Re: Weekend Update 9/9/12
« Reply #12 on: September 08, 2012, 09:51:04 AM »
0
Tried some subtle weathering on a mech reefer.....the stainless is always a challenge to weather....

Model railroading isn't saving my life, but it's providing me moments of joy not normally associated with my current situation..... Train are good!

Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 24069
  • Head Kino
  • Respect: +7958
    • Conrail 1285
Re: Weekend Update 9/9/12
« Reply #13 on: September 08, 2012, 10:11:47 AM »
0
I made some good progress assembling my Intermountain reefer kits. About 10 days or so ago, I had 38 left to build. Right now, I have 14 to go. :)

You could almost say you're smoking the reefers...

M.C. Fujiwara

  • Crew
  • *
  • Posts: 1344
  • I'm my own personal train-er.
  • Respect: +84
Re: Weekend Update 9/9/12
« Reply #14 on: September 08, 2012, 10:14:06 AM »
0
Finished up a lot of scenery on the Free-moN return loop & staging module:


After I shot that video I added a bunch o' details like peeps & DKS's fine crates:







More details in the Layout Construction thread.
Keep up the groovy work, peeps!
Happy weekend.
M.C. Fujiwara
Silicon Valley Free-moN
http://sv-free-mon.org/