0 Members and 1 Guest are viewing this topic.
Lookin good... Show the shot of your cab doors.
Coming along nicely i see. Perhaps by 2020 you'll have built the whole UP steam fleet. Cheers! -Cody F.
Now that's a target to live for , but a 4-12-2 and a 4-10-2 might be beyond my abilities .
Not me, I built the 3800 class 2-10-2 to figure out the frame mods needed to build a 4-12-2. I've been a little delayed over the last year but, frame parts for this beast were cast tonight, boiler is 60% done. Glad I have large raduis curves!!
Small update,got some much needed work done to the right end of the Grain elevator complex.By the way it is now known as the Gorman Grain Co.Some of the other N scalers here know who Dick Gorman is i am sure.Some quick details,the elevator is almost 36" long and except for the loading shed is scratchbuilt. The office and garage is a painted and mildly modified Walther's Stateline Farm supply.The warehouse is a Micro-Engineering building.It will either get repainted to match the office or replaced with a Pikestuff building.
I made some good progress assembling my Intermountain reefer kits. About 10 days or so ago, I had 38 left to build. Right now, I have 14 to go.