I think it was the Fugate article that said 60% of all yard and siding space. I don't think you would count passing tracks, etc. on that, just normal places where you would park cars. I keep it to that, but have a lot of staging, and figure that area about 80-90% full, with visible layout at 60%. It seems to work out well for me.Best to start with the lower %, because you know you will go nowhere but up over time....its what we MRR do!
Rivet counting is something I never done because I just want to have fun. Todd Treaster, NY,S&A's Pittsburgh Division
Rivet counting is something I do just because I want to have fun!Cheers!Bob Gilmore
If you just count yard and have no bridge traffic, that's fine. If you have bridge traffic or "rotating blocks" like at one local layout here, then you will need much more than that,Phil
The staging tracks hold main line trains where yards holds cars that terminated there until they can be made into another train.Even if you have a loads in/empties out operation those are still main line tracks that holds assigned trains till called.Bridge traffic usually runs from stagging to stagging-again main line trains that just runs across the layout since those trains runs between "connection" points.Of course these trains could drop or pickup cars off in our yard(s) but,as a rule of thumb they're just passing through and not terminating.
The formula I use on my switching layouts is based on prototype observation along with my rail experience.Some "days" the local with have the full 5 car maximum(the workable number allowed without jamming things up) while on other days the local may arrive with 0-4 cars depending on inbound traffic.Some "days " there is no work-actually these are the days I decided to work on the scenery,structures,roads or clean track..
They also did a presentation at the NMRA MER Piedmont Crossing convention last fall. Here's a small synospis of it, http://home.comcast.net/~prrndiv/operations.html,Phil
That's also where I got the formula I use to figure out capacity. Thanks for the reminder, I could not remember where I had seen the info!http://home.comcast.net/~prrndiv/ccandwb.html
Yeah, he's actually setup Excel spreadsheets for the layouts we all operate on.