Welcome,
Guest
. Please
login
or
register
.
1 Hour
1 Day
1 Week
1 Month
Forever
Login with username, password and session length
Home
Help
Login
Register
TheRailwire
»
General Discussion
»
N and Z Scales
»
A segmented layout?
« previous
next »
Print
Pages: [
1
]
2
3
Go Down
Author
Topic: A segmented layout? (Read 5579 times)
0 Members and 1 Guest are viewing this topic.
daniel_leavitt2000
Crew
Posts: 6444
Respect:
+1427
A segmented layout?
«
on:
January 16, 2011, 04:10:15 PM »
0
No luck here today. I completed this post two times and each time it somehow got lost. Hopefully the third time is a charm.
I have been catching up on Ian’s progress on his new Boston Line (Springfield) layout. Lots of awesome ideas. He is several years ahead of me already. Its great to see he has the time, space and resources to make this happen.
Looking at my own plans for the Worcester-Boston portion of the line, I have run into many problems. My basement floods, and this needs to be addressed before anything else.
The layout of the basement is pretty bad. I have a bulkhead door at each end. One is a walkout to the back yard while the other is to an enclosed storage area under the front porch. Yes, strange as it may seem my porch actually has a basement of its own. Worse, the water/sewer/gas hookups are at the other end of the oil tank. And just to top it off, the water heater, boiler and chimney are smack dab in the middle of the basement.
To make the layout I want, I would need the whole basement. I could wall off the appliances with an access hatch under the layout, but this would mean a lot of walls, angles and corners would like to avoid. I would also need to tear out walls and large portions of the layout if something needed replacement.
I could build the layout around the appliances, but again, large portions of the layout would need to be pulled for service. The idea of a giant monolithic oil tank looking over the trains isn’t very palatable either. I could move stuff around, but that costs a lot of money, and the low ceiling means I am very limited in terms of running pipes around.
But what if the layout was segmented? Say I split the layout into three diorama-like sceniced parts: Worcester-Grafton, Westboro-Framingham, Beacon Park-South Station. The three would be connected by a mainline ring track that would be little more than track on a 4 inch shelf. The diorama areas are really the only areas of operation, so I wouldn’t loose much operability. I could start and end each segment with natural scene barriers and set them window box style in a valence with proper lighting.
This way I can control the look of the areas I want without trying to work around closets and access areas for the heating equipment, I could also force the viewer to focus on the areas that matter and build them with better detail rather than attempt to compress long stretches of mainline. Operations crews would know their areas, no cities would overlap and the cost of the layout could be cut dramatically.
Thoughts, ideas?
Logged
American eyes, American eyes
View the world from American eyes
Bury the past, rob us blind
And leave nothing behind
chuck geiger
Crew
Posts: 3564
Gender:
Train Talk Media
Respect:
+3957
Re: A segmented layout?
«
Reply #1 on:
January 16, 2011, 04:11:56 PM »
0
Have you thought about building an out building for the layout?
Logged
Chuck Geiger
traintalkmedia@gmail.com
https://www.youtube.com/@traintalkmedia
https://www.facebook.com/profile.php?id=61583065102122
DKS
The Pitt
Crew
Posts: 13424
Respect:
+7027
Re: A segmented layout?
«
Reply #2 on:
January 16, 2011, 04:13:35 PM »
0
Can you make a rough sketch of your basement space and the fixtures in it? This will help with visualization.
Logged
daniel_leavitt2000
Crew
Posts: 6444
Respect:
+1427
Re: A segmented layout?
«
Reply #3 on:
January 16, 2011, 04:17:28 PM »
0
I'll try and get a scetch done overnight at work.
Logged
American eyes, American eyes
View the world from American eyes
Bury the past, rob us blind
And leave nothing behind
John
Administrator
Crew
Posts: 13997
Respect:
+4178
Re: A segmented layout?
«
Reply #4 on:
January 16, 2011, 04:17:55 PM »
0
every layout is a compromise ..
Logged
wm3798
Crew
Posts: 16551
Gender:
I like models. She likes antiques. Perfect!
Respect:
+7433
Re: A segmented layout?
«
Reply #5 on:
January 16, 2011, 04:22:42 PM »
0
One important thought. Before you consider enclosing your appliances, check your local codes about what you can and can't do. While to some degree codes are a meaningless way for bureaucrats to exercise their power over their subjects, a lot of it makes good common sense to make sure you don't suffocate yourself or blow up your house.
I would accept the fact that the basement presents you with an opportunity to either take five years to plan your uber layout, and set about the tasks of fixing the flooding problem (that would be a deal breaker for me; trains and water don't mix well...) and looking into smaller, more energy efficient appliances that can be installed out of harm's way. OR,
I would accept that the floor plan of the basement is what it is, and design my layout accordingly. Sometimes this means including those horrible "model railroady" features that make Ed's skin crawl, but at some point, you have to recognize your limitations. If compromising on the layout plan is not in the cards, then decide how much time and how many resources you have to commit to fixing the basement issues, and budget both accordingly.
Lee
Logged
Rockin' It Old School
Lee Weldon
www.wmrywesternlines.net
Dave Schneider
Crew
Posts: 2377
Respect:
+51
Re: A segmented layout?
«
Reply #6 on:
January 16, 2011, 07:07:49 PM »
0
I feel your pain Daniel. In my case, I don't have a basement so I have to settle for part of the garage. I have decided to go the modular route, and have a 4 x 15 foot area with access on all sides. I scored some industrial pallet rack from Craigslist so that the layout will be 60 inches above the garage floor with storage underneath. Each module is being built in shadowbox style with a roof over each section and the ability to seal off the front when not in operation. I will have two 2 foot by 6 foot modules on each side with 1.5 x 4 foot section on each end to form a simple oval. The track will be layed out so that I can reconfigure into a longer section or substitute the ends for 90 degree curves as space allows. Here is a quick sketch of sorts showing my plan (done in Powerpoint...the end curves will be 15 inch radius). There will be some staging on incorporated as well as a branch line off one end to an industrial section over my workbench. This approach has allowed me to get started building instead of planning, and allows me to work on one module at a time in the comfort of my family room.
Best wishes, Dave
Logged
If you lend someone $20, and never see that person again, it was probably worth it.
daniel_leavitt2000
Crew
Posts: 6444
Respect:
+1427
Re: A segmented layout?
«
Reply #7 on:
January 17, 2011, 12:29:33 AM »
0
Here is a rough sketch of the basement. The devider between the porch and basement is a cement load bearing wall and can not be removed.
Logged
American eyes, American eyes
View the world from American eyes
Bury the past, rob us blind
And leave nothing behind
daniel_leavitt2000
Crew
Posts: 6444
Respect:
+1427
Re: A segmented layout?
«
Reply #8 on:
January 17, 2011, 12:53:10 AM »
0
So this is the basic idea. The mainline would exit the boxed layout areas and run into the next viewpoint. I could run the mainline behind movable bookshelves or storage areas. To access the bulkheads or equipment, I could just remove a small section of mainline without having to cut through scenery.
Logged
American eyes, American eyes
View the world from American eyes
Bury the past, rob us blind
And leave nothing behind
DKS
The Pitt
Crew
Posts: 13424
Respect:
+7027
Re: A segmented layout?
«
Reply #9 on:
January 17, 2011, 02:29:58 AM »
0
If it comes as any consolation, I've seen worse. Anyway, a couple of quick questions. Do you use the exterior walkout a lot? Do you use the porch storage area for much of anything? Obviously you can't remove the inner porch wall, but can you punch a couple of small holes through it? (My immediate thought is to use it for staging...) Also... would shifting the water heater a little be out of the question? (Usually they're not that hard to relocate.)
Logged
Craig Martyn
Crew
Posts: 496
Gender:
Respect:
+6
Re: A segmented layout?
«
Reply #10 on:
January 17, 2011, 02:41:17 AM »
0
This might be of good reference for a segmented layout idea:
http://macrodyn.com/ldsig/wiki/index.php?title=Cascade_Subdivision_-_N_-_Mark_Lestico
Logged
Craig Martyn
BLMA Models
www.BLMAmodels.com
daniel_leavitt2000
Crew
Posts: 6444
Respect:
+1427
Re: A segmented layout?
«
Reply #11 on:
January 17, 2011, 02:52:54 AM »
0
1. we use the exterior walk-out a lot because we do not have a back door. The previous owners removed a door on the main floor and turned the mudroom into a second, tiny bathroom. I plan on adding a slider to the dining room for a second entrance, which would mean the basement walk-out can be removed/covered.
2. I can bore holes in the porch devider.
3. I may need to replace the water heater soon as the flooding last year caused the bottom to start to rest. I was thinking of placing it next to the boiler paralell to the stairs.
Logged
American eyes, American eyes
View the world from American eyes
Bury the past, rob us blind
And leave nothing behind
Chris333
Crew
Posts: 19561
Respect:
+6852
Re: A segmented layout?
«
Reply #12 on:
January 17, 2011, 03:24:40 AM »
0
Doesn't seem very segmented:
http://macrodyn.com/ldsig/wiki/index.php?title=Cascade_Subdivision_-_N_-_Mark_Lestico#Track_Plan
I just looked up tankless water heaters on ebay. A bunch for around $200, but I haven't done any research. I don't need a H2O heater, but I like to save money on gas.
Could you duckunder to the porch? That would leave most of the layout connected with just a drop section for your back door. This would be the only no sceniced area near the oil tank.
Logged
John
Administrator
Crew
Posts: 13997
Respect:
+4178
Re: A segmented layout?
«
Reply #13 on:
January 17, 2011, 06:50:39 AM »
0
I wouldn't plug up the basement door .. you need to be able to get to the oil tank, furnace, etc .. plus, it's probably a code requirement
Logged
SebastianLee
Guest
Re: A segmented layout?
«
Reply #14 on:
January 17, 2011, 07:01:59 AM »
0
Is the oil tank in use? If not has it been "closed in place" (ie filled with inert material). Will it fit through the door? If you do remove it make sure to take out the exterior fill line. Find out who will take it and whats required before moving it though.
The bigger problem is the flooding. Start at the roof and work your way down. Even if you have clean gutters clogged down spouts can cause a lot of headaches. Just remember the three rules 1. Get rid of the water 2. Get rid of the water 3. Get rid of the water
Logged
Print
Pages: [
1
]
2
3
Go Up
« previous
next »
TheRailwire
»
General Discussion
»
N and Z Scales
»
A segmented layout?