0 Members and 1 Guest are viewing this topic.
My helix occupancy circuit project resumed this week with arrival of the holders for the LED emitters and detectors on either side of the track. They were designed by my friend Mark Dance for his CP Rail Columbia & Western layout and were produced in aluminum on a water jet cutter. The opening for the diodes is designed to hold them firmly and precisely yet enable them to be adjusted in aim. The design was modified slightly for my installation with the addition of fold down tabs to help locate the holder on the edge of the helix sub-roadbed.The photograph below shows the holders as they come out of the cutter and after bending into the desired shape:Here is a pair of the holders sitting on the helix sub-roadbed for a test fit:
This week also saw completion of the eight UNPX rotary gondolas. Six cars were finished with transverse air brake reservoirs and side logo plates for the PROCOR 'Flying P' logogram:The last two cars were completed with longitudinal air brake reservoirs and without side logo plates, as they will receive the later PROCOR word mark scheme: