0 Members and 1 Guest are viewing this topic.
I can't imagine that designing and building the tooling for a new coupler is cheaper (even in the long run) than licensing an existing design!
It would be absurd for Bmann to tool a poor freightcar, yet crank out such a nice 44T. The Atlas Trainman stuff (new tooling) is nice tooling, just don't have the detail of the regular stuff like etched walkways. I think (hope) it'll be an acceptable car.
UP1950's wroteThe trainboard brought up a good point . Bachmann in HO did a 52 and a 63 inch driver 4-6-0 . The smaller one looks more like the UP . I bet they go with the bigger one though . Crap , so close !
The GE 70 tonner will be a nice addition, as the 4-6-0 for the steamheads, but I'm scratching my head on the GP7. I don't get the logic of choosing an already available model over doing something, well, not available. Maybe something similar at least, like a late phase GP9 or a CF7? (Yes, I know about the variations! But Athearn managed to choose one version, so I imagine another manufacturer could too.)