0 Members and 1 Guest are viewing this topic.
I predict you now have the layout's centerpiece scene in the works. Given its drama and its smack-dab-in-the-middle location, it ought to stop new visitors in their tracks. Casselman Crossing may be taking a distant second place as the model railfan hotspot.
David, there will be an update to the track plan in your hands shortly...
If I can get that bridge to look even a little bit like Ohiopyle... David might be right! Vive le Sweet Spot!(Better modeling through peer pressure, INDEED!!)
It took a few alligator clips and extension wires, but BL-2 82 pulled a train of 10 cars and a caboose from Maryland Jct. up through Thomas and the Oliver Twist to the siding at Kerens last night. I need one more female Cinch Jones (or is it a male?) to complete the connections to get all the way into Elkins. (There's a lift out section in front of the window). The High Bridge track is cut and and installed, and up on blocks to allow traffic to pass. I also put in the bridge track for the Narrows Crossing in the way back.As expected, I have the wire colors reversed from the helix to Elkins. I guess I should make a warning label so I don't forget that.Anyway, the next step will be to wire the turnout decoder into the Kerens siding, and finish the bus connections to Elkins. Once that's done, I'll paint the bridge fro Kerens so I can permanently install the trackwork between it and the helix.Once that's done, I'll work on the scenery base for the hard to reach pieces in and out of the helix, and I guess build the sky board that will surround the helix. I'll lose access to the big hole in the layout once the main line through Cumberland gets installed. I also have to permanently install the storage tracks through Thomas and wire all the turnouts in there...Lee