0 Members and 1 Guest are viewing this topic.
Ok, let's bring this back a little here.I still think we can achieve what we want and still be compatible. I REALLY think the built in grades will be trouble. This is years (27) of portable model railroad experience talking here. There is enough variance in the systems already. Adding more complexity will be troublesome. Mark my words.I think we should look towards being moderately compatible. Being part of those large setups is NOT something I would want to miss, and, quite frankly, I want to be able to work with the existing groups that I am a member of with this. That'll make getting started much easier.So how about this. Instead of maintaining strict adherence to the standards, lets work from the BANTRAK onetrak standards. They're close enough, there's a good bit of leeway, and I think they are the smart place to start. They use C55, DCC, all the goodies we want. The only thing we'd be missing is the third track (no problem, one of my modules already has one), and the spacing. But those are much easier to work with.What say you to this?http://bantrak.net/?q=node/14
You better believe you can! Our next show is in the fall, and I think we'll actually be hurting for real estate. Got a drawing of the whole thing? I'm sure we can try and work it in.BANTRAK is having a meeting this weekend too, I think I'll bring it up (although I'm sure it'll be read here first).
Okay how are you going to transport all these modules and what happens if one module with part of the grade or an Ntrak transition module is a no show? How many people who own individual modules are going to be able to attend a given event for this layout to be built and operated. With Ntrak its a simple matter of plugging in another module but you can't do that because of the grade.