Author Topic: L&HR construction pending...  (Read 11807 times)

0 Members and 1 Guest are viewing this topic.

asciibaron

  • Guest
Re: L&HR construction pending...
« Reply #15 on: February 25, 2009, 07:24:05 AM »
0
Paul's book is a "now and then" type of thing, retracing the line.  i have the Boyd/Antz book, and have ordered the Flags, Diamonds and Statues article.  I've also joined the Anthracite Railroads Historical Society.

if i put the staging 6" below the grades are enormous and stupid looking.  i really haven't been able to come up with a way to have staging and keep the spirit of the L&HR.

back to being paralysed

wm3798

  • Crew
  • *
  • Posts: 16551
  • Gender: Male
  • I like models. She likes antiques. Perfect!
  • Respect: +7433
    • Western Maryland Railway Western Lines
Re: L&HR construction pending...
« Reply #16 on: February 25, 2009, 08:19:17 AM »
0
Now that the panel of experts has resolved the WM's yard issues, perhaps it's time to tackle Steve's staging conundrum.

Lee
Rockin' It Old School

Lee Weldon www.wmrywesternlines.net

asciibaron

  • Guest
Re: L&HR construction pending...
« Reply #17 on: February 25, 2009, 08:21:34 AM »
0
Now that the panel of experts has resolved the WM's yard issues, perhaps it's time to tackle Steve's staging conundrum.

i think David was glad to help you since it was an "easy" project - i think he's done with me.  i'll be in his neck of the woods this weekend.  i'll drop by so you can smack me.

if i change Warwick to be Hudson and make it 4 through tracks and the main, that might work - that would require the code 55 curved turnouts, if they ever make it out of the shipping container.
« Last Edit: February 25, 2009, 08:23:14 AM by asciibaron »

wm3798

  • Crew
  • *
  • Posts: 16551
  • Gender: Male
  • I like models. She likes antiques. Perfect!
  • Respect: +7433
    • Western Maryland Railway Western Lines
Re: L&HR construction pending...
« Reply #18 on: February 25, 2009, 08:31:45 AM »
0
I'm also a much more likable person ;D  I guess I lack a certain level of intensity... :-*

Lee
Rockin' It Old School

Lee Weldon www.wmrywesternlines.net

asciibaron

  • Guest
Re: L&HR construction pending...
« Reply #19 on: February 25, 2009, 08:35:20 AM »
0
I'm also a much more likable person ;D  I guess I lack a certain level of intensity... :-*

no more beer for you.

wm3798

  • Crew
  • *
  • Posts: 16551
  • Gender: Male
  • I like models. She likes antiques. Perfect!
  • Respect: +7433
    • Western Maryland Railway Western Lines
Re: L&HR construction pending...
« Reply #20 on: February 25, 2009, 09:03:03 AM »
0
 I meant David... I'm more likable than David! :o

Lee
Rockin' It Old School

Lee Weldon www.wmrywesternlines.net

asciibaron

  • Guest
Re: L&HR construction pending...
« Reply #21 on: February 25, 2009, 09:11:56 AM »
0
I meant David... I'm more likable than David! :o

the beer faerie is not amused.

DKS

  • The Pitt
  • Crew
  • *
  • Posts: 13424
  • Respect: +7027
Re: L&HR construction pending...
« Reply #22 on: February 25, 2009, 10:19:03 AM »
0
I meant David... I'm more likable than David! :o

Most people are more likable than David.

asciibaron

  • Guest
Re: L&HR construction pending...
« Reply #23 on: February 25, 2009, 10:32:56 AM »
0
Most people are more likable than David.

and then there's me ;)

post count

DKS

  • The Pitt
  • Crew
  • *
  • Posts: 13424
  • Respect: +7027
Re: L&HR construction pending...
« Reply #24 on: February 25, 2009, 10:48:40 AM »
0
A long time ago in a thread far, far away, a staging yard was recommended as just a loop around the very back edge of the layout, set just slightly lower than the rest of the track. Why not start looking at that again, with a few changes:

Run the staging yard leads off the main at each end of the Franklin siding. From these points, run the yard leads downgrade along the walls, and run the mainline upgrade and pulled in slightly. Staging yard ladders would be to the upper left and right of the plan, with the staging tracks across the top back. They would all be exposed except at the top left and right corners, where the mine and Warwick yard would pass over the staging yard.
« Last Edit: February 25, 2009, 11:59:57 AM by David K. Smith »

davefoxx

  • Crew
  • *
  • Posts: 12332
  • Gender: Male
  • TRW Plaid Member
  • Respect: +8545
Re: L&HR construction pending...
« Reply #25 on: February 25, 2009, 11:12:00 AM »
0
I meant David... I'm more likable than David! :o

Most people are more likable than David.

Of course, there's only 1400 Davids in here, so God knows which one is actually being referred to.  ;)

Dave #273

A Proud HOer
BUY ALL THE TRAINS!
Still General Counsel to the Laurel Valley Ry.

DKS

  • The Pitt
  • Crew
  • *
  • Posts: 13424
  • Respect: +7027
Re: L&HR construction pending...
« Reply #26 on: February 25, 2009, 11:16:34 AM »
0
I know Steve's next post will be, "pic, please?"

So, here it is, in all its paintshop crudeness.

[img width= height=]http://lh4.ggpht.com/_F9IuZckKa2c/SaV4K1gLqYI/AAAAAAAAHns/iAm24uHmwQ4/s800/lhr-extended-1.jpg[/img]
« Last Edit: February 25, 2009, 11:56:48 AM by David K. Smith »

DKS

  • The Pitt
  • Crew
  • *
  • Posts: 13424
  • Respect: +7027
Re: L&HR construction pending...
« Reply #27 on: February 25, 2009, 11:57:40 AM »
0
I meant David... I'm more likable than David! :o
Most people are more likable than David.
Of course, there's only 1400 Davids in here, so God knows which one is actually being referred to.  ;)

Dave #273

In this case, it was Dave #147, a.k.a. me.

asciibaron

  • Guest
Re: L&HR construction pending...
« Reply #28 on: February 25, 2009, 12:15:37 PM »
0
I know Steve's next post will be, "pic, please?"

So, here it is, in all its paintshop crudeness.

[img width= height=]http://lh4.ggpht.com/_F9IuZckKa2c/SaV4K1gLqYI/AAAAAAAAHns/iAm24uHmwQ4/s800/lhr-extended-1.jpg[/img]

it might work better is the staging was in front of the yard... this way i could fiddle while a train takes a lap...

let's see you paintshop crudeness on that

wm3798

  • Crew
  • *
  • Posts: 16551
  • Gender: Male
  • I like models. She likes antiques. Perfect!
  • Respect: +7433
    • Western Maryland Railway Western Lines
Re: L&HR construction pending...
« Reply #29 on: February 25, 2009, 12:27:50 PM »
0
Don't put staging in front.  That would make it less than hidden.
You can still fiddle with the staged trains over on the left and or right sides at the staging throats..

Lee
Rockin' It Old School

Lee Weldon www.wmrywesternlines.net