0 Members and 1 Guest are viewing this topic.
What is the time frame of your layout? Just before the bridge fire, they were down to one train a day each way. Plus a local. Not a lot of staging needed then.
In 1967, the PRR was still running AST-1 and -2 between Cedar Hill and E. St. Louis and JET-1 and -2 between Cedar Hill and Chicago 59th St. on a daily basis, so that's two PRR run-throughs daily over the L&HR in each direction.
i can think of no way to add staging that does not result in hidden trackage that would prove difficult to clean and even more difficult to extract a derailed car from.
IIRC, a long, long time ago in a track plan far, far away, there was one wherein the staging yard ran along one wall and part of another, and was simply hidden by a low backdrop of buildings. Perhaps that's an idea worth revisiting...
Quote from: David K. Smith on January 22, 2009, 06:25:54 AMIIRC, a long, long time ago in a track plan far, far away, there was one wherein the staging yard ran along one wall and part of another, and was simply hidden by a low backdrop of buildings. Perhaps that's an idea worth revisiting...do you have that plan handy? i think it was problematic because it ate into the main and reduced the layout to a single siding - i can either have a racetrack with staging or a layout with some industries and a yard but no staging. my wee brain is fried - Model Railroading is Fun, right?