Author Topic: Franksville Wisconsin N-scale modutrak module buildout  (Read 118180 times)

0 Members and 1 Guest are viewing this topic.

Mark5

  • Crew
  • *
  • Posts: 11834
  • Always with the negative waves Moriarty ...
  • Respect: +929
Re: Franksville Wisconsin MiNi Mod-U-Trak modules buildout
« Reply #135 on: August 04, 2009, 12:14:23 PM »
0
Here's the results of making a standing seam jig:




This is good stuff.


sirenwerks

  • Crew
  • *
  • Posts: 6021
  • Gender: Male
  • Respect: +505
Re: Franksville Wisconsin MiNi Mod-U-Trak modules buildout
« Reply #136 on: August 04, 2009, 01:09:06 PM »
0
I agree! I just got back from west Bend and I want more Wisconsin!
Failing to prepare is preparing to fail.

Sokramiketes

  • Crew
  • *
  • Posts: 5385
  • Better modeling through peer pressure...
  • Respect: +2149
    • Modutrak
Re: Franksville Wisconsin MiNi Mod-U-Trak modules buildout
« Reply #137 on: August 04, 2009, 01:17:52 PM »
0
It's summer, any updates are probably going to involve das autos!

lashedup

  • Crew
  • *
  • Posts: 879
  • Respect: +108
    • Model 160
Re: Franksville Wisconsin MiNi Mod-U-Trak modules buildout
« Reply #138 on: August 05, 2009, 11:33:57 AM »
0
BUMP

We want updates!!! (and pictures!).

LOL - so do I!

Summer is just busy with three youngsters and tough hobby-wise as I fall into cars and motorcycles while the weather is nice. That said, I promise that this topic will continue again as I need to wrap up these two modules for upcoming shows this fall. I've made some piece-meal progress here and there, plus I've been working on hand-laid turnouts for our upcoming yard project. More on that later.

You guys bugging me for updates help keeps me motivated though... :)

-jamie

Philip H

  • Crew
  • *
  • Posts: 9023
  • Gender: Male
  • Respect: +1791
    • Layout Progress Blog
Re: Franksville Wisconsin MiNi Mod-U-Trak modules buildout
« Reply #139 on: August 06, 2009, 11:55:09 AM »
0
Well, having other interests makes you a well rounded person.  Of course, so will eating at the Conrail weekend, if photographic evidence is to be believed.

Lookking forward to more pics.  :D
Philip H.
Chief Everything Officer
Baton Rouge Southern RR - Mount Rainier Division.


Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 26033
  • Head Kino
  • Respect: +11461
    • Conrail 1285
Re: Franksville Wisconsin MiNi Mod-U-Trak modules buildout
« Reply #140 on: August 06, 2009, 02:28:06 PM »
0
Well, having other interests makes you a well rounded person.  Of course, so will eating at the Conrail weekend, if photographic evidence is to be believed.

Lookking forward to more pics.  :D


Ahahahahahahahahahahahahah

asciibaron

  • Guest
Re: Franksville Wisconsin MiNi Mod-U-Trak modules buildout
« Reply #141 on: August 06, 2009, 02:29:48 PM »
0
Ahahahahahahahahahahahahah

don't cough on your swine log.

Hiroe

  • Crew
  • *
  • Posts: 594
  • Respect: +256
Re: Franksville Wisconsin MiNi Mod-U-Trak modules buildout
« Reply #142 on: August 06, 2009, 07:06:13 PM »
0
Ahahahahahahahahahahahahah

don't cough choke on your swine log.

Fixed that for you.

Jamie, been following this thread with great interest. Any idea what the actual radius is on that corner module pair?

--Drew
wubba lubba dub dub

Sokramiketes

  • Crew
  • *
  • Posts: 5385
  • Better modeling through peer pressure...
  • Respect: +2149
    • Modutrak
Re: Franksville Wisconsin MiNi Mod-U-Trak modules buildout
« Reply #143 on: August 06, 2009, 09:55:34 PM »
0
Ahahahahahahahahahahahahah

don't cough choke on your swine log.

Fixed that for you.

Jamie, been following this thread with great interest. Any idea what the actual radius is on that corner module pair?

--Drew

Should be about 52" radius.

Hiroe

  • Crew
  • *
  • Posts: 594
  • Respect: +256
Re: Franksville Wisconsin MiNi Mod-U-Trak modules buildout
« Reply #144 on: August 06, 2009, 10:04:48 PM »
0
Should be about 52" radius.

Hm. Is that Track centerlines radius, or front frame edge radius?
wubba lubba dub dub

Sokramiketes

  • Crew
  • *
  • Posts: 5385
  • Better modeling through peer pressure...
  • Respect: +2149
    • Modutrak
Re: Franksville Wisconsin MiNi Mod-U-Trak modules buildout
« Reply #145 on: August 06, 2009, 10:10:43 PM »
0
Should be about 52" radius.

Hm. Is that Track centerlines radius, or front frame edge radius?

They're cut from single sheets of 5' x 5' plywood, so that front edge is 60" radius.  Track centerlines are 6.75" and 8" from the front at the ends, so take a little off for the few inches of tangent at the module interface and I guessed 52".

sirenwerks

  • Crew
  • *
  • Posts: 6021
  • Gender: Male
  • Respect: +505
Re: Franksville Wisconsin MiNi Mod-U-Trak modules buildout
« Reply #146 on: January 08, 2010, 05:26:39 PM »
0
I was just wondering if there was any progress in Franksville in the last five months?
Failing to prepare is preparing to fail.

lashedup

  • Crew
  • *
  • Posts: 879
  • Respect: +108
    • Model 160
Re: Franksville Wisconsin MiNi Mod-U-Trak modules buildout
« Reply #147 on: December 20, 2010, 12:10:40 PM »
0
Back from the dead...

Well, not dead, but I haven't made updates in quite a while (understatement!). Now that winter is back, I've made some progress here and there...

Franksville buildings have kept me busy and I've more recently been making some progress and should have a few updates over the next couple months.
Did I mention resin cast walls are a pain in the arse to work with? Varying thickness, warped, blah, blah, blah. I've got so much cross bracing in this thing it isn't funny. Plus I have to fix a general twist to the building from front to back, but it is getting there. Roof pieces are cut and ready to go. I need to add some roof drains, cap the parapet wall after the roof is on and add roof details. I also need to paint and weather it  Warehouse building in progress:




Klema - ongoing progress update:



Modern day prototype which is a little different today:





I have the loading dock built and the overhead roof above the loading dock as well. I need to add the incoming electric connections, attach the roof and add trim pieces. I also need to re-glue some of the siding back down and weather this thing up a bit to bring out the details. The connector building needs roofing material and I have another garage storage building to add.

Lots more work to do, but it is coming along.
« Last Edit: February 19, 2014, 11:00:07 PM by lashedup »

sizemore

  • The Pitt
  • Crew
  • *
  • Posts: 2778
  • Respect: +143
Re: Franksville Wisconsin MiNi Mod-U-Trak modules buildout
« Reply #148 on: December 20, 2010, 02:14:15 PM »
0
Back from the dead...

Well, not dead, but I haven't made updates in quite a while (understatement!). Now that winter is back, I've made some progress here and there...

Franksville buildings have kept me busy and I've more recently been making some progress and should have a few updates over the next couple months.
Did I mention resin cast walls are a pain in the arse to work with? Varying thickness, warped, blah, blah, blah. I've got so much cross bracing in this thing it isn't funny. Plus I have to fix a general twist to the building from front to back, but it is getting there. Roof pieces are cut and ready to go. I need to add some roof drains, cap the parapet wall after the roof is on and add roof details. I also need to paint and weather it  Warehouse building in progress:

...

Klema - ongoing progress update:

...

Modern day prototype which is a little different today:

...
...

I have the loading dock built and the overhead roof above the loading dock as well. I need to add the incoming electric connections, attach the roof and add trim pieces. I also need to re-glue some of the siding back down and weather this thing up a bit to bring out the details. The connector building needs roofing material and I have another garage storage building to add.

Lots more work to do, but it is coming along.


6 months later! Glad to know you work at the same glacial pace that I do! ;D

Looking good!
The S.
« Last Edit: December 21, 2010, 04:02:31 PM by sizemore »

Thompson Sub: Instagram | Youtube | Website

sirenwerks

  • Crew
  • *
  • Posts: 6021
  • Gender: Male
  • Respect: +505
Re: Franksville Wisconsin MiNi Mod-U-Trak modules buildout
« Reply #149 on: December 21, 2010, 10:09:30 AM »
0
Is that 'warehouse' a kit? I'm curious what the prototype should look like.

Bryan B.
Failing to prepare is preparing to fail.