Author Topic: already considering modifications  (Read 4679 times)

0 Members and 1 Guest are viewing this topic.

asciibaron

  • Crew
  • *
  • Posts: 3101
  • Respect: +1
    • Steve's Happy Fun Time IntarWebs
already considering modifications
« on: September 17, 2007, 07:48:49 PM »
0
doesn't take long to want to make changes to trackplans - no matter how many times do run it on simulation, it never is the same as in hand.  i'm considering making some changes to give the layout a more prototypical feel - the Panhandle Division was a 2 track affair into Conrail and not having that 2nd track is obvious.

here is the as built:



and it is with the mods:



-'67 trying to keep it real
Quote from: Chris333
How long will it be before they show us how to add DCC to a tree?

DKS

  • The Pitt
  • Crew
  • *
  • Posts: 13424
  • Respect: +7024
Re: already considering modifications
« Reply #1 on: September 17, 2007, 08:21:10 PM »
0
It's a familiar story I know all too well.

wm3798

  • Crew
  • *
  • Posts: 15730
  • Gender: Male
  • I like models. She likes antiques. Perfect!
  • Respect: +5391
    • Western Maryland Railway Western Lines
Re: already considering modifications
« Reply #2 on: September 17, 2007, 08:44:25 PM »
0
Don't fret.  Once you start actually operating trains, you'll discover modifications that will make said operations more fluid.  Be glad you're making these discoveries before a lot of scenery and permanent type wiring is done...

Lee
Rockin' It Old School

Lee Weldon www.wmrywesternlines.net

asciibaron

  • Crew
  • *
  • Posts: 3101
  • Respect: +1
    • Steve's Happy Fun Time IntarWebs
Re: already considering modifications
« Reply #3 on: September 17, 2007, 09:33:02 PM »
0
Don't fret.  Once you start actually operating trains, you'll discover modifications that will make said operations more fluid.  Be glad you're making these discoveries before a lot of scenery and permanent type wiring is done...

Lee

after the trackwork is in place, i typically move at glacial speeds (pre global warming).  i'm always tweaking here and there, but i usually do a fair job in the planning stages to limit the operational headaches.  these mods are strictly to capture the feel of the prototype - i have to have a 2 track main for it to really be the Panhandle in 1967.

you should have seen the plywood of my HO 4x8 growing up - swiss cheese had less holes.

-steve
Quote from: Chris333
How long will it be before they show us how to add DCC to a tree?

seusscaboose

  • The Pitt
  • Crew
  • *
  • Posts: 2045
  • Respect: +190
Re: already considering modifications
« Reply #4 on: September 17, 2007, 10:01:33 PM »
0
a two track main gets you halfway to a 4 track main!

now we are talking!

like i said... change the N&W to NKP and we are smooth.....
"I have a train full of basements"

NKPH&TS #3589

Inspiration at:
http://nkphts.org/modelersnotebook

asciibaron

  • Crew
  • *
  • Posts: 3101
  • Respect: +1
    • Steve's Happy Fun Time IntarWebs
Re: already considering modifications
« Reply #5 on: September 17, 2007, 10:14:25 PM »
0
a two track main gets you halfway to a 4 track main!

now we are talking!

like i said... change the N&W to NKP and we are smooth.....


4 track main, is that one main and 3 really long sidings?  it's the NKP, just 4 years into NW ;)

-steve
Quote from: Chris333
How long will it be before they show us how to add DCC to a tree?

asciibaron

  • Crew
  • *
  • Posts: 3101
  • Respect: +1
    • Steve's Happy Fun Time IntarWebs
Re: already considering modifications
« Reply #6 on: September 18, 2007, 07:09:29 AM »
0
last night i modified the lead into the 2 track staging area and the lead to the warehouse district - now it resembles a 2 track main - i'll tackle the lead to the staging area later this week as time allows.

-That's Mr. 1967 to you
Quote from: Chris333
How long will it be before they show us how to add DCC to a tree?

John

  • Administrator
  • Crew
  • *****
  • Posts: 13157
  • Respect: +2894
Re: already considering modifications
« Reply #7 on: September 18, 2007, 09:35:53 AM »
0
Hey .. I make mods all the time  :)

Allentown Hump

  • Crew
  • *
  • Posts: 886
  • Respect: 0
Re: already considering modifications
« Reply #8 on: September 18, 2007, 11:30:18 AM »
0
Why don't you add a crossover in the hidden staging right were it becomes "hidden" so you can do some easier switching moves in between operating sessions...
A-Town Hump

"I believe the technical term for you would be 'a$$hat extraordinaire'."

asciibaron

  • Crew
  • *
  • Posts: 3101
  • Respect: +1
    • Steve's Happy Fun Time IntarWebs
Re: already considering modifications
« Reply #9 on: September 18, 2007, 01:07:29 PM »
0
Why don't you add a crossover in the hidden staging right were it becomes "hidden" so you can do some easier switching moves in between operating sessions...

the hidden staging holds 7-9 cars plus cabin and loco.  what exactly am i going to be switching in such a limited space?

-steve
Quote from: Chris333
How long will it be before they show us how to add DCC to a tree?

Allentown Hump

  • Crew
  • *
  • Posts: 886
  • Respect: 0
Re: already considering modifications
« Reply #10 on: September 18, 2007, 01:31:55 PM »
0
Why don't you add a crossover in the hidden staging right were it becomes "hidden" so you can do some easier switching moves in between operating sessions...

the hidden staging holds 7-9 cars plus cabin and loco.  what exactly am i going to be switching in such a limited space?

-steve

Sooooo does that mean the rest of your layout is just for show? Your hidden staging is the largest switching area you have on that layout! I'm sorry for thinking...  ::)
A-Town Hump

"I believe the technical term for you would be 'a$$hat extraordinaire'."

Mark5

  • Crew
  • *
  • Posts: 10884
  • Always with the negative waves Moriarty ...
  • Respect: +531
Re: already considering modifications
« Reply #11 on: September 18, 2007, 04:46:54 PM »
0
my track plan is in a constant state of flux and will be until the last rail is laid. :o

asciibaron

  • Crew
  • *
  • Posts: 3101
  • Respect: +1
    • Steve's Happy Fun Time IntarWebs
Re: already considering modifications
« Reply #12 on: September 19, 2007, 07:19:49 AM »
0


Sooooo does that mean the rest of your layout is just for show? Your hidden staging is the largest switching area you have on that layout! I'm sorry for thinking...  ::)

still have no idea what you are talking about
Quote from: Chris333
How long will it be before they show us how to add DCC to a tree?

Pomperaugrr

  • Crew
  • *
  • Posts: 1454
  • Respect: +1197
Re: already considering modifications
« Reply #13 on: September 19, 2007, 08:59:15 AM »
0
You might want to consider adding a cross-over at the end of the hidden staging on the right.  It would function essentially as an engine escape track.That would allow a train to head into staging, the engine could cut off from the train and run around it to restage for the next trip out.

The plan looks interesting.

Eric

Mark5

  • Crew
  • *
  • Posts: 10884
  • Always with the negative waves Moriarty ...
  • Respect: +531
Re: already considering modifications
« Reply #14 on: September 19, 2007, 09:15:12 AM »
0


Sooooo does that mean the rest of your layout is just for show? Your hidden staging is the largest switching area you have on that layout! I'm sorry for thinking...  ::)

still have no idea what you are talking about

Hmm, them staging tracks look like places to park trains to me ... (ie not a classification yard)