0 Members and 1 Guest are viewing this topic.
Just a quick note, I have started the etching process for both 2 and 4-track Lines East signal bridges that have an increased width for people running track spacing that is larger than prototypical.I just received the plans from the PRRHS for the Lines West signal bridge and will them available in Nov. These will also have an increased width.
How long will it be before they show us how to add DCC to a tree?
And something else for the SPFs too:http://www.railpictures.net/viewphoto.php?id=201090
Quote from: TrainCat2 on September 13, 2007, 07:58:25 AMJust a quick note, I have started the etching process for both 2 and 4-track Lines East signal bridges that have an increased width for people running track spacing that is larger than prototypical.I just received the plans from the PRRHS for the Lines West signal bridge and will them available in Nov. These will also have an increased width.i need to span 3 tracks on my N-Trak module - should i go for a standard spacing 4 track?-'67
BobAny word on the Mast Signal? I know signal bridges are more exciting but with mostly single line on my layout I need those even more.
But considering the G22 gons were going to be done after the G39's... and the G22's were still going to be done by the end of the summer... and the G39 still isn't shipping... and the G22 is no longer even on the web site...When will we really have anything?Bob, I sincerely hope you deliver. But a lot of "one man shops" have gone down the road of "Yes, I can make that" and it doesn't happen. Please, maintain the credibility. Your work is first class... no doubt about that!
Is there any manufaturer you don't troll?