0 Members and 1 Guest are viewing this topic.
That would be my suggestion! And, like the others said, IF you needed a longer piece, you could solder two pieces together, and have the ties face the right way on both. But as you said, no joints is even better.Maybe ask the UP? Page 11, February "Railfan & Railroad", UP laying new track: "The crew used machines undreamt of in the steam era to remove the old track while replacing it with 33 new, pre-assembled, quarter-mile-long panels."Prototype flextrack???
My good friend and fellow crazy Gregg Cudworth is building a basement full of the RGS in Nn3, using C30 "ribbon rail" soldered to a PCB tie every 7th tie. He is laying it on laminated Masonite subroadbed, mounted to premium pine benchwork. Last year, Gregg went down to his basement in the afternoon to work on his layout and ALL of his C30 rails were kinked between PCB ties. He figured out that his premium pine benchwork had shrunk in the five years or so since he'd laid that track, so he cut expansion joints every 3' and the kinks disappeared. Code 30 "ribbon rail" is just flattened wire and come on 300' spools. Some of Gregg's hand laid track had continuous lengths of rail that were over 30' long.Cheerio!Bob Gilmore
I don't understand this. If every 7th tie is glued down and rail is soldered to it how does the rail move between the PC ties?I use PC ties about every inch and the only way I can think to gap the rails would be to gap them every inch. That is the only way they can move right? So I gave up.