
Santa Fe did research a Gas Turbine with Westinghouse and Baldwin.
the idea was to use the Demo Centipede frame,but this didn't get built.
Westinghouse-Baldwin then came up with the "Blue Goose" gas tubine on
rigidly attached B-B-B-B trucks,it didn't sell and was scrapped by 1955 or so.
ifo in a Train Shed Reprint of Railway Mechanical Engineer.
Allis Charmers also tried to get in on Turbines about 1948,again info in a
Train Shed reprint of RME.
Alco-GE did build 1 Demo Tubine used on U.P.,#-50,and 10 Production Turbines
for U.P.
GE built the remaining 45 Turbines for U.P.
interesting Locos.
Spikre