Author Topic: HO Trains go Round and Round: Heavy Electric Modular updates.  (Read 1074 times)

0 Members and 1 Guest are viewing this topic.

Hiroe

  • Crew
  • *
  • Posts: 594
  • Respect: +256
Finally got the primary 12 corner modules finished, enough for a complete loop.

Before installing all the tracks, at a work-session setup:

Set up at the EPTC bi-annual meet in Oaks, PA, with a number of straight modules added in:






No wire yet, but that's moving up to the project bench now. I also have some truth tables sketched out for working signalling, with each module having an inductive occupancy detector on each track.

Thanks to Chris (GreenEliteCab here on the forum) and Adam for their participation.

--Drew
wubba lubba dub dub

Philip H

  • Crew
  • *
  • Posts: 9023
  • Gender: Male
  • Respect: +1791
    • Layout Progress Blog
Re: HO Trains go Round and Round: Heavy Electric Modular updates.
« Reply #1 on: May 13, 2013, 10:48:29 AM »
0
Very nice.  I can't wait to see the wire go up.  Ar eyou doing custom masts, or mod'ing a commercial product?
Philip H.
Chief Everything Officer
Baton Rouge Southern RR - Mount Rainier Division.


Hiroe

  • Crew
  • *
  • Posts: 594
  • Respect: +256
Re: HO Trains go Round and Round: Heavy Electric Modular updates.
« Reply #2 on: May 13, 2013, 11:55:16 AM »
0
Very nice.  I can't wait to see the wire go up.  Ar eyou doing custom masts, or mod'ing a commercial product?

Philip,
I can't speak for anyone else; but all my work is custom. I build jigs for constructing everything as a set of standardized subassemblies, then just put all the parts together in place. Raw phosphor-bronze and steel wire, H column from Special Shapes, insulator castings from Titchy.

I'll take some photos tonight of the wire construction progress.

--Drew
wubba lubba dub dub