Finally got the primary 12 corner modules finished, enough for a complete loop.
Before installing all the tracks, at a work-session setup:
Set up at the EPTC bi-annual meet in Oaks, PA, with a number of straight modules added in:
No wire yet, but that's moving up to the project bench now. I also have some truth tables sketched out for working signalling, with each module having an inductive occupancy detector on each track.
Thanks to Chris (GreenEliteCab here on the forum) and Adam for their participation.
--Drew