Anyone notice that they were having a devil of a time installing the switch in the foreground? When it was first positioned, they connected the frog rail to the existing rail. Later, after the curve leading into it was laid, they cut it apart and took a 3-4 foot chunk of rail out. But the rail was still offset to one side, so they finally had to rip up several yards of the line and re-lay the rail. What's the old saying? Measure twice, cut once? Someone screwed up...