0 Members and 1 Guest are viewing this topic.
Track = Code 55. I prefer ME, but ok to plan with Atlas range. Handlaying turnouts would be feasible.Min Radius = 15" (autoracks, 89' flats and 86' boxcars etc) so the larger the better.I'd rather single deck, as I don't think I have the space for a helix, but runs to below deck staging would be ok (as in the Soeberg plan). I hadn't really considered grades at all yet....Should mention era would be modern - mid 90's to present. David, I have a scanner so I can hook you up over the weekend.
I'm also open to removeable staging areas or main line linkages that can be added for op sessions, like this:http://www.trainboard.com/grapevine/picture.php?albumid=1080&pictureid=14827