0 Members and 1 Guest are viewing this topic.
Check out page 153 of the current copy of MRH.http://issuu.com/mr-hobbyist/docs/mrh-2010-jul-aug-ol?viewMode=presentation&mode=embed I really need to figure out what to do with that section of layout.
Read Marty's column... It's almost like he's a member of the Railwire... ;D (which he is...) p. 143
Yes, do something, ANYTHING every day. The dull stuff like wiring is often made more tenable by breaking it up into 20 minute chunks. Last night I was working on the switch throws in Thomas... This after I unwisely let a train run unsupervised through a turnout I thought was spiked... I sent a pair of F units down the sawmill siding and then tumbling over the precipice into the scenery cart. Fortunately they landed softly on a bag of sculptamold... Immediately the blue flags went up, and the track crew got to work to make all the turnouts functional.Lee
Wow, the color is totally messed up on those Kato P's. (page 153)(maybe it's my monitor!)