Author Topic: Operations updated with New Track Plans and Photos...  (Read 3735 times)

0 Members and 1 Guest are viewing this topic.

Bob Bufkin

  • Crew
  • *
  • Posts: 6397
  • Gender: Male
  • Respect: +44
Re: Operations updated with New Track Plans and Photos...
« Reply #15 on: February 22, 2010, 06:33:51 PM »
0
Know where your talking about but never shot any photos from there.  The parking lot at Laurel is a great place to get some shots looking up at the equipment for a different view.

sirenwerks

  • Crew
  • *
  • Posts: 6047
  • Gender: Male
  • Respect: +515
Re: Operations updated with New Track Plans and Photos...
« Reply #16 on: February 22, 2010, 06:45:04 PM »
0
When the music stops and everyone has a chair, let me know what's left. Are you adding that hostler gig?
Failing to prepare is preparing to fail.

wm3798

  • Crew
  • *
  • Posts: 16589
  • Gender: Male
  • I like models. She likes antiques. Perfect!
  • Respect: +7524
    • Western Maryland Railway Western Lines
Re: Operations updated with New Track Plans and Photos...
« Reply #17 on: February 22, 2010, 11:14:39 PM »
0
There will be a need for a hostler, yes.

The jobs will shake out more or less like this...
1.  Dispatcher.  This will manage the trains in and out of staging, and control meets at the various sidings around the layout.  I want to build a CTC board at the workbench/desk so I can control all the train movements from one location.  The only exception would be Maryland Junction, which will have to be controlled locally to accommodate the mill switcher.  So...

2.  MY Tower operator.  (Probably the same guy doing the mill switching, since he'll already be standing there.)

3.  Yardmaster - Ridgeley

4.  Engine Terminal operator Ridgeley (That would be the hostler job)  This position will manage the power swaps as Reading power arrives from the east, NW Power from the west, and various specialized WM power between the east and west subs.

5.  Yard Clerk - This will be a very important job, keeping the paper moving right along with the trains.

6. Yardmaster - Elkins (this one is new) To run the coal mine locals on the Thomas Sub, the West Local, and manage empties in and loads out trains at Elkins.

7.  Road Crew - Connellsville to Ridgeley (Alpha Jets, Ore Trains, Grain Trains, Laurel Valley)

8.  Road Crew - Elkins to Ridgeley  (West/East Locals, Coal Extras)

9.  Road Crew - Ridgeley to East Staging i.e. Lurgan and Baltimore (Eastbound Coal, Grain, and Fast Freight, PC Interchange, etc. and westbound counterparts.)

10.  Paper Mill Switcher

11.  Local Crews - Thomas Sub, North Junction, Cumberland

Man.  That's a lot of beer. :o

Rockin' It Old School

Lee Weldon www.wmrywesternlines.net

Philip H

  • Crew
  • *
  • Posts: 9030
  • Gender: Male
  • Respect: +1797
    • Layout Progress Blog
Re: Operations updated with New Track Plans and Photos...
« Reply #18 on: February 23, 2010, 07:15:24 AM »
0
You sir are going to need a bigger beer fridge.   ;)
Philip H.
Chief Everything Officer
Baton Rouge Southern RR - Mount Rainier Division.


wm3798

  • Crew
  • *
  • Posts: 16589
  • Gender: Male
  • I like models. She likes antiques. Perfect!
  • Respect: +7524
    • Western Maryland Railway Western Lines
Re: Operations updated with New Track Plans and Photos...
« Reply #19 on: February 23, 2010, 08:22:27 AM »
0
With a little rotation, I think we can run full out with 6 head.  So let's see, a case and a half per person per hour... 8)

At that point the only thing that'll be rotatin' will be the room!
Lee
Rockin' It Old School

Lee Weldon www.wmrywesternlines.net

sirenwerks

  • Crew
  • *
  • Posts: 6047
  • Gender: Male
  • Respect: +515
Re: Operations updated with New Track Plans and Photos...
« Reply #20 on: February 25, 2010, 12:18:13 AM »
0
So the big question is - when's the next ops session? It's a perfect excuse for me to clean my car out, so I can haul bodies in commute.
Failing to prepare is preparing to fail.