Author Topic: LHR - getting there  (Read 1964 times)

0 Members and 1 Guest are viewing this topic.

asciibaron

  • Guest
LHR - getting there
« on: August 18, 2009, 10:08:52 PM »
0
was messing around with industry locations in the amalgamated town

in the foreground is Hardin Lumber which had a coal pier, then, on the left will be the Limecrest facility (many covered hoppers), then is the Harris Pine Mill - they made furniture from western pine.

the train on the main has 15 cars (mostly 40') and is heading east toward Warwick, NY.  the state line is just around the next bend.



the line in the back will be hidden with an 8" backdrop.
« Last Edit: August 18, 2009, 10:10:36 PM by asciibaron »

Dave V

  • Crew
  • *
  • Posts: 12230
  • Gender: Male
  • Foothills Farm Studios -- Dave's Model Railroading
  • Respect: +11645
Re: LHR - getting there
« Reply #1 on: August 18, 2009, 10:20:51 PM »
0
Sweet!  Can't wait until you start cutting roadbed.

asciibaron

  • Guest
Re: LHR - getting there
« Reply #2 on: August 18, 2009, 10:28:26 PM »
0
Sweet!  Can't wait until you start cutting roadbed.

probably not gonna happen this weekend - kids go back to school next week.

Philip H

  • Crew
  • *
  • Posts: 9024
  • Gender: Male
  • Respect: +1793
    • Layout Progress Blog
Re: LHR - getting there
« Reply #3 on: August 19, 2009, 08:22:49 AM »
0
Nicely done!  That sting of 40 footers looks good going around that curve - is that your expected radius for the whole layout?
Philip H.
Chief Everything Officer
Baton Rouge Southern RR - Mount Rainier Division.


asciibaron

  • Guest
Re: LHR - getting there
« Reply #4 on: August 19, 2009, 11:06:34 AM »
0
Nicely done!  That sting of 40 footers looks good going around that curve - is that your expected radius for the whole layout?

visible minimum is 16" - most will be 18" and hidden is 15" - i'm planning for 87' trailer flats :)

the track will head to the left of the container and then curve to the right and end up where the rail cutters are on the grade.
« Last Edit: August 19, 2009, 11:08:15 AM by asciibaron »

asciibaron

  • Guest
Re: LHR - getting there
« Reply #5 on: August 20, 2009, 09:37:01 PM »
0
making some more progress...



getting the majority of the mainline and industries laid out.  i have 11 industries that can handle a total of 30 cars.  not bad.  here's an overview from the family room.



and here's the Sterling Hill zinc mine - you can see the approach on the previous picture - the grades will not be that steep, the boards are warped and i put the bow facing up.  i'm looking at having 3 tracks at the mine - a round around and the load out.




here's what the prototype load out looks like now:



http://www.bing.com/maps/default.aspx?v=2&FORM=LMLTCP&cp=qvdk0p8sgpp0&style=b&lvl=2&tilt=-90&dir=0&alt=-1000&phx=0&phy=0&phscl=1&scene=18402408&encType=1



« Last Edit: August 20, 2009, 09:40:18 PM by asciibaron »

Philip H

  • Crew
  • *
  • Posts: 9024
  • Gender: Male
  • Respect: +1793
    • Layout Progress Blog
Re: LHR - getting there
« Reply #6 on: August 21, 2009, 07:40:05 AM »
0
Cool!  Can't wait to see the Loader you build.  I assume a good kitbashing candidate?
Philip H.
Chief Everything Officer
Baton Rouge Southern RR - Mount Rainier Division.


asciibaron

  • Guest
Re: LHR - getting there
« Reply #7 on: August 21, 2009, 08:00:30 AM »
0
Cool!  Can't wait to see the Loader you build.  I assume a good kitbashing candidate?

i was thinking of starting with the Glacier Gravel kit

asciibaron

  • Guest
Re: LHR - getting there
« Reply #8 on: August 22, 2009, 12:33:36 PM »
0
did some more work on the laying out of things.  i'm feeling really positive right now.  i had seemed to have painted myself into a corner with regard to trying to maintain a prototype track arrangement, but i finally was able to overcome that and just work with what i have.  as long as i keep things in the correct sequence and direction, i'm happy.

looking at 12 sidings for a total for 33 cars.  add in the 4 track yard and engine servicing at Warwick, and i think the layout has a ton of potential for some fun operating sessions. the plan is to be able to have the line be run by a single operator (me) or as many as three (i have two sons).  two road crews and one working the yard at Warwick.

i'm hoping to have the staging yard in place in the next week or so - i have to pick up a number of turnouts and track first.

central.vermont

  • Crew
  • *
  • Posts: 2627
  • Gender: Male
  • Jon
  • Respect: +148
Re: LHR - getting there
« Reply #9 on: August 22, 2009, 04:04:18 PM »
0
I was thinking of starting with the Glacier Gravel kit

Good luck finding one of those kits! :o

Hope you already have it.  ;)

Jon

Chris333

  • Crew
  • *
  • Posts: 19548
  • Respect: +6849
Re: LHR - getting there
« Reply #10 on: August 22, 2009, 04:15:15 PM »
0
There are 6 of them on e-bay right now.

Quote
Glacier Gravel