My local NMRA Division has setup for our annual display at the mall in my town. This year we had 3 layouts running for Black Friday. We are open for display Friday afternoons / evenings and all day on Saturdays.

These preparations have slowed down my modeling a bit, but I did complete the bridge deck for the DL&W main at Bath NY. (The superstructure will take many more weeks.) Here it is temporarily installed on its abutments and center pier. I have built up and painted the riverbed and adjacent landforms. Once the sealant at the layout edge fully cures I can 'pour' the river.

I need to get this done, the deck permanently installed and track in place over it by mid-January, as I am hosting our monthly meeting then.

Ron