Author Topic: UP's new classification yard under construction  (Read 2067 times)

0 Members and 1 Guest are viewing this topic.

Jbub

  • Crew
  • *
  • Posts: 1908
  • Gender: Male
  • HP 9999
  • Respect: +610
UP's new classification yard under construction
« on: June 28, 2018, 10:38:24 AM »
+1
Normally we see tracks being removed from yards. Not completely new yards being built.
"Noooooooooooooooooooo!!!!!!"

Darth Vader

C855B

  • Crew
  • *
  • Posts: 11421
  • Respect: +2883
Re: UP's new classification yard under construction
« Reply #1 on: June 28, 2018, 12:33:29 PM »
0
UP has been building yard capacity for several years in out-of-the-way locations. F'rinstance, we're in the middle of nowhere at the far eastern reach of UP's system, and have an new "regional intermodal" facility under construction 15 miles away. Go figure.

"1300 ... cars per day" "...single largest capital investment in the company's 156-year history."

There's some investor-relations puffery at play here. That's a small yard as these go and the architectural overview indicates a flat yard, so there must be techno-magic tricks to claim that capacity. As far as the cost, that has to be not adjusted for inflation in the comparison... or the real estate cost was through the roof. Probably both. We had to miss the shareholder's meeting last month, which is likely what that vid was prepared for.
...mike

http://www.gibboncozadandwestern.com

Note: Images linked in my postings are on an HTTP server, not HTTPS. Enable "mixed content" in your browser to view.

There are over 1000 images on this server. Not changing anytime soon.

davefoxx

  • Crew
  • *
  • Posts: 12339
  • Gender: Male
  • TRW Plaid Member
  • Respect: +8564
Re: UP's new classification yard under construction
« Reply #2 on: June 28, 2018, 09:27:12 PM »
+1
They forgot the cork roadbed.  :P

DFF

A Proud HOer
BUY ALL THE TRAINS!
Still General Counsel to the Laurel Valley Ry.

MK

  • Crew
  • *
  • Posts: 4353
  • Respect: +955
Re: UP's new classification yard under construction
« Reply #3 on: June 28, 2018, 09:31:05 PM »
0
They forgot the cork roadbed.  :P

DFF

Nah!  I heard they are going to use Unitrack.  :P

Point353

  • Crew
  • *
  • Posts: 3724
  • Respect: +915
Re: UP's new classification yard under construction
« Reply #4 on: June 28, 2018, 09:54:34 PM »
+1
They forgot the cork roadbed.  :P
Plus, they do the scenery first and then lay the track.

basementcalling

  • Crew
  • *
  • Posts: 3922
  • Gender: Male
  • Respect: +1056
Re: UP's new classification yard under construction
« Reply #5 on: June 29, 2018, 04:07:36 AM »
0
How are they going to mount the turnout motors under the roadbed? The backdrop ain't so grand either.   :D
Peter Pfotenhauer

TLOC

  • Crew
  • *
  • Posts: 317
  • Respect: +93
Re: UP's new classification yard under construction
« Reply #6 on: June 29, 2018, 10:38:54 AM »
0
I think they added the ground foam and static grass too early.

Those roads look very realistic, they should do a write up.

TomO

davefoxx

  • Crew
  • *
  • Posts: 12339
  • Gender: Male
  • TRW Plaid Member
  • Respect: +8564
Re: UP's new classification yard under construction
« Reply #7 on: June 29, 2018, 11:35:06 AM »
0
Nah!  I heard they are going to use Unitrack.  :P

Nah!  That's clearly flextrack and prefab turnouts at 0:26 in the video.   :D

DFF

A Proud HOer
BUY ALL THE TRAINS!
Still General Counsel to the Laurel Valley Ry.

up1950s

  • Crew
  • *
  • Posts: 9959
  • Gender: Male
  • Respect: +2875
Re: UP's new classification yard under construction
« Reply #8 on: June 29, 2018, 07:52:01 PM »
0
Maybe it is really a yard to store lack of need equipment that would normally be used for Can-Am commerce .


Richie Dost

nkalanaga

  • Crew
  • *
  • Posts: 10579
  • Respect: +1755
Re: UP's new classification yard under construction
« Reply #9 on: June 30, 2018, 02:05:22 AM »
0
"How are they going to mount the turnout motors under the roadbed?"

They're not.  The motors go on top, alongside the turnouts, just like trainset turnouts.
N Kalanaga
Be well

Englewood

  • Crew
  • *
  • Posts: 937
  • Respect: +411
Re: UP's new classification yard under construction
« Reply #10 on: June 30, 2018, 10:04:57 PM »
0
2600 car capacity and two humps when fully built.
Designed and buillt for DCC.

nkalanaga

  • Crew
  • *
  • Posts: 10579
  • Respect: +1755
Re: UP's new classification yard under construction
« Reply #11 on: July 01, 2018, 01:19:20 AM »
0
"Designed and built for DCC"

With remote control locomotives common in yards and industries today, that might not be as far-fetched as it sounds.  I could see someone using wireless DCC in an industrial setting.
N Kalanaga
Be well

MK

  • Crew
  • *
  • Posts: 4353
  • Respect: +955
Re: UP's new classification yard under construction
« Reply #12 on: July 01, 2018, 08:41:48 AM »
0
2600 car capacity and two humps when fully built.
Designed and buillt for DCC.

Will JMRI work with it?   :trollface: