Author Topic: Frac Sand and Ballast  (Read 779 times)

0 Members and 1 Guest are viewing this topic.

Blazeman

  • Crew
  • *
  • Posts: 1306
  • Respect: +65
Frac Sand and Ballast
« on: June 03, 2015, 01:42:16 PM »
0
Interesting parallel to what modelers do for roadbed...dribble an adhesive to dry and lock the ballast in place. Wonder what they'll do for surface tension relief?

http://www.progressiverailroading.com/mow/article/UWMadison-researchers-hope-fracsand-impact-study-will-help-railroads-improve-ballast-maintenance--44639?source=pr_digital06/03/2015&usedate=06/03/2015

eja

  • Crew
  • *
  • Posts: 1526
  • Gender: Male
  • Respect: +278
Re: Frac Sand and Ballast
« Reply #1 on: June 03, 2015, 02:33:57 PM »
0
An interesting read ..... thanks for posting.

peteski

  • Crew
  • *
  • Posts: 35284
  • Gender: Male
  • Honorary Resident Curmudgeon
  • Respect: +6646
    • Coming (not so) soon...
Re: Frac Sand and Ballast
« Reply #2 on: June 03, 2015, 03:56:36 PM »
0
Using glue to hold ballast on 1:1 tracks is nothing new.  Back in 2005 when I visited Japan, when I was waiting on the platform of a Shinkansen (bullet train) I noticed that the ballast on the tracks was sealed with some sort of adhesive.  It even had a satin sheen like when you apply too much white glue to N scale ballast.  They do that so when a train goes by the station at high speed the ballast isn't kicked up onto the platform and passengers waiting there.
. . . 42 . . .