As an FYI, when I build a removable/moveable section, I install the benchwork, including all the "working" parts, and secure them in place, then build the track work as a solid, continuous run as if it were going to be permanent that way. Then, once I'm completely satisfied that the alignment is where I want it, and have it securely glued down and ballasted (this locks the track down pretty well) I go back and carefully dremel out the track joints along the same line as the benchwork joint.
In some cases I would add a set of guard rails through the joint as well.
Lee