0 Members and 1 Guest are viewing this topic.
Ok that’s it. No more dang tugboat! Finally finished the tug for the layout. The Ropes of Scale place came through. Really, really nice product.To make the front and side buffers I used short pieces of the rope, dipped one end in CA, held that end down and scraped the piece with the blunt side of a steel blade, pulling it away from the glued end repeatedly until all strands separated and frayed out in a fan like shape. It was actually kind of fun.
With the rest of the backdrops up, I've been working on the vegetation. Here is the Windy Point- Henry House scenes so far.
Quick video of the last trains on my "late" Pennsylvania-Reading Seashore Lines layout.When I have fully recovered from by colonoscopy/endoscopy adventures I'll update with the reasons for the PRSL's demise and future plans.(I think I have one more layout left in me. )
I am almost done with another car in the vegetation train. The cab car has functional ditch lights for those long backing moves.! (Attachment Link) (Attachment Link)
JP, how did you make that grass/field?