Author Topic: T-Trak one question about T-Trak  (Read 597 times)

0 Members and 1 Guest are viewing this topic.

OldEastRR

  • Crew
  • *
  • Posts: 3806
  • Gender: Male
  • Respect: +518
one question about T-Trak
« on: November 21, 2026, 02:35:20 AM »
0
And Ntrack, Onetrack, et al....... how can you do continuing operations on it? How do the cars delivered to industries, set out in yards, built into trains, run on schedules, be placed as they were in last position from set-up to set-up? Or are these venues not meant for operations?
« Last Edit: November 23, 2026, 07:02:33 AM by John »

OrangeAnon

  • Crew
  • *
  • Posts: 63
  • Gender: Female
  • Respect: +67
Re: one question about T-Trak
« Reply #1 on: November 21, 2026, 07:00:45 AM »
0
Operations are indeed possible and do happen on such modular layouts, but there should be no expectation of picking up where you left off after taking the layout down and setting up somewhere else, as rarely will the modules ever be arranged exactly the same way again.
Alexis W.

peteski

  • Crew
  • *
  • Posts: 35477
  • Gender: Male
  • Honorary Resident Curmudgeon
  • Respect: +6710
    • Coming (not so) soon...
Re: one question about T-Trak
« Reply #2 on: November 21, 2026, 07:23:37 AM »
0
Those modular layouts are designed for temporary setup tear-down (usually at model train shows), so if any operations do happen, they only last for as long as the layout is put together. And yes, the arrangement differ from show to show. The rules are different, depending on a locos club.

If members are into OPS and willing, depending on whether the trackage on the modules is even geared towards operations, it is possible, especially if a club has a permanent location to set up. But let's face it, NTRAK and T-TRAK are roundy-round running for the benefit of the model train show spectators. That was the original goal. Nothign more enterntining for the moving crowd to see than bunch of little trains running by.  I'm actually in such show this weekend with my NTRAK club (Greenberg Show in Wilmington, MA).

BTW, it is NTRAK, not Ntrack.
. . . 42 . . .

robert3985

  • Crew
  • *
  • Posts: 3608
  • Respect: +2006
Re: one question about T-Trak
« Reply #3 on: November 21, 2026, 12:15:41 PM »
0
Way back when before the turn of the Century, our local NTRAK club had a nice place to permanently set up, so we developed a preferred setup and developed an operations schedule and routine for the permanent setup.  Club members were able to show up just about anytime to work on their modules, but regular operating sessions were rare as some club member preferred to work on their modules at home.

However, during shows, it was fairly easy to have periods of time that we operated in spite of the NTRAK philosophy of JUST RUN TRAINS, and surprisingly, much interest was generated amongst the spectators who watched the operations going on, making up trains, picking up and setting out cars at various locations/industries on the setup.

But, when we participated in the large setups that had other clubs involved, we would rarely do any operations, unless asked to do so by the show officials, which we did a few times quite successfully even though these "operations" were very simple and uncomplicated.  Having three mainlines allowed both roundy-rounding for the average spectators, and operations for the more involved spectators who were generally amazed at how good operations can be with N-scale trains, most having been indoctrinated to believe that operations were only viable in HO scale or bigger.

Although NTRAK is not T-TRAK, I would think that local clubs could organize a regular setup configuration that is flexible enough to allow insertion of new or visiting modules, but still have the industries and yards located in approximately the same functional positions on the setup so at least some sort of operation could be achieved...or not.

Deep individualization is an attraction for those who want to "express themselves" using model trains as their medium, but, for those wanting a more realistic look as well as "feel"...meaning a somewhat realistic operations protocol, having a moonscape, Jurassic Park, or Spongebob Squarepants module to run through will probably be off-putting.

Cheerio!
Bob Gilmore

« Last Edit: November 23, 2026, 01:52:55 PM by robert3985 »

OldEastRR

  • Crew
  • *
  • Posts: 3806
  • Gender: Male
  • Respect: +518
Re: one question about T-Trak
« Reply #4 on: November 23, 2026, 05:18:52 AM »
0
I too set up an operations on an Ntrack club layout, and only when we were set up in our own quarters. It's quite an interesting operation, as basically only one main has spurs on it (the rear line), tho sometimes there was a spur off the front track. We were lucky in having two yards so we could do yard to yard ops. We only ran it 2 or 3 times, the effort was not worth the set-up and schedules.

 Tho clubs can show off roundy-round displays with modules, it's too bad onlookers can't get to see the operations part of model RRing. There is something satisfying about switching a yard or working spurs with a local. I think that's the best part of running trains -- to do real thinking about what you do with them. 

randgust

  • Crew
  • *
  • Posts: 3291
  • Respect: +3018
    • Randgust N Scale Kits
Re: one question about T-Trak
« Reply #5 on: November 23, 2026, 09:43:18 AM »
+2
The other approach is to look at Ttrak as a modular method to home layout building that 'just happens' to be portable to shows.

I've taken that approach to mine; the original Hickory Valley layout is a two-module logging line (non-Ttrak) that has had operations from the start; logging to mill, mill to interchange, etc.

The interchange however, has grown like topsy.  That's now a series of PRR based modules including the interchange at West Hickory, the bridge over the Allegheny, the sawmill at West Hickory that happens to be Nn3, etc.   When assembled as a 'layout', it's a shortline interchange with the PRR.   Or restack the deck and it's 7 Ttrak modules and building.  And that's enforced build quality that is the same as a home layout would be, painted and ballasted track, real scenery, etc.   Only concession to Ttrak is geometry, end connectors, and module size. 

I'm scratchbuilding almost everything, using historic photos and valuation maps, and when I'm gone, they are destined for the historical societies in the towns.  That's the other thing, you can make some very nice historically accurate scenes in Ttrak that unlike a  basement sized layout, can leave the basement for the next life.

Taking mine to shows instead of being stuck in the basement is one of the fun things.   Only then can I see a 40-car train bearing down the main line, and run my own long equipment on the PRR side of the world.

Maletrain

  • Crew
  • *
  • Posts: 4278
  • Respect: +933
Re: one question about T-Trak
« Reply #6 on: November 23, 2026, 10:36:13 AM »
0
The Fre-MoN setup at the NMRA Convention in Chattanooga this summer had operations for convention goers to sign up for.  My wife and I did a session.  It must have been pretty elaborate to plan, because it used a fast clock and schedules for passenger operations, which ran through the layout along with local switching jobs with several freights that needed to keep clear of the first-class trains.  We thought it was fun to do.  But I think it must have been a lot of work to set up.

The Fre-moN setup was single-track, with yards at both ends.  But, there were loops beyond the yards, so the yards were really not used in the way we use them at our fixed layouts at our club.

The N-Trak and T-Trak standards, with their separate loops, also make yards more difficult to use in any sort of prototypical manner.  And the narrowness of the modules, particularly for T-Trak, is pretty restrictive.

So, I am seeing this type of module yards as only staging for trains to run the mainline, not really as sorting facilities.

But, I think that mainline running and industry switching can be done pretty easily.  And, with diamond crossings instead of crossovers, industries can be switched from the outer loop as well as the inner loop.  Of course, anything that causes one loop to foul another loop requires operators on all of the trains, so that collisions can be avoided.  Unsupervised roundy-round running can only work simultaneously on the same layout if the roundy-round track is completely isolated.  But, that can be done with roundy-round on the outer loop and switching on the inner loop(s).

Playing with Anyrail software, I have even designed an engine facility with turntable and roundhouse that can fit a double-deep T-Trak setup on a 30" wide table.  So, at least getting a loco, hitching it to a train, adding a caboose can be done to make the roundy-round operation a bit more fun.

But, without sorting yards and something like a car card system, each op session is sort of a pre-canned scenario that needs to be thought through and written up with switch list, time tables, etc.  So, a lot of effort and maybe some loss of interest if the operation is not varied sufficiently from session to session.

Still, as a demonstration of ops with N scale, I think it is useful at train shows.

peteski

  • Crew
  • *
  • Posts: 35477
  • Gender: Male
  • Honorary Resident Curmudgeon
  • Respect: +6710
    • Coming (not so) soon...
Re: one question about T-Trak
« Reply #7 on: November 23, 2026, 11:23:20 AM »
+1
NTRAK: All capital letters with no hyphen or space.
T-TRAK: All capital letters with a hyphen between the two "T"s.

Yes I'm being an A$$, but isn't that just as easy to type like Ntrack, N-Trak,  Ttrak, T-Trak.  Bob knows how to do it.  :D
. . . 42 . . .

Maletrain

  • Crew
  • *
  • Posts: 4278
  • Respect: +933
Re: one question about T-Trak
« Reply #8 on: November 23, 2026, 06:48:41 PM »
0
Typing it isn't as hard as remembering it!   :|

Maybe the NTRAKy guys could have been a little less inCONsisTent?  :trollface:

peteski

  • Crew
  • *
  • Posts: 35477
  • Gender: Male
  • Honorary Resident Curmudgeon
  • Respect: +6710
    • Coming (not so) soon...
Re: one question about T-Trak
« Reply #9 on: November 23, 2026, 07:19:52 PM »
0
Typing it isn't as hard as remembering it!   :|

Maybe the NTRAKy guys could have been a little less inCONsisTent?  :trollface:

What do you mean?  NTRAK and T-TRAK were always spelled with all caps. EZ-PZ. :P
. . . 42 . . .

Point353

  • Crew
  • *
  • Posts: 3780
  • Respect: +931
Re: one question about T-Trak
« Reply #10 on: November 23, 2026, 07:27:37 PM »
+1
What do you mean?  NTRAK and T-TRAK were always spelled with all caps. EZ-PZ. :P

N-Trak: https://web.archive.org/web/19990203041725/http://www.ntrak.org/ntkstd.html

Maletrain

  • Crew
  • *
  • Posts: 4278
  • Respect: +933
Re: one question about T-Trak
« Reply #11 on: November 23, 2026, 07:52:26 PM »
0
And there is UniTrack.

It's enough to mentally derail many of us geezers with single-track minds running in "dark territory" without signals.   :facepalm:

Maybe Tom could make a TRW specialized spell checker of posts here?  :trollface:

SAH

  • Crew
  • *
  • Posts: 1314
  • Respect: +1992
Re: one question about T-Trak
« Reply #12 on: November 23, 2026, 08:55:51 PM »
+1
The Operations Roadshow at the NMRA national in Novi and Chattanooga employed Free-MoN modules.  Yes, a great deal of planning went into both events.

Ops as expressed by car forwarding exercises can be done, and has been done, for two day shows using Free-MoN modules.  The Ops organizer usually supplies the switch lists, generated by any means they are familiar with, and the necessary freight cars.  That makes it easier to create the paperwork of course.  The operator supplies motive power and a willingness to play nicely with the folks who just want to run trains.  The play nicely requirement cuts in both directions of course.

It usually works well.  We've found NTRAK and TTRAK guys want to come over and run an ops train on occasion.  That's one reason for putting in the effort to set up an ops component.  Replicating what the prototype did/does adds another dimension to our hobby that not enough people take advantage of.  My opinion of course.
Steve Holzheimer
Lakewood, OH
Modeling the AC&Y Spur 4 Serving the Tire Industry

robert3985

  • Crew
  • *
  • Posts: 3608
  • Respect: +2006
Re: one question about T-Trak
« Reply #13 on: November 24, 2026, 09:17:37 AM »
0
And then there's Wikipedia: https://en.wikipedia.org/wiki/NTrak

Cheerio!
Bob Gilmore

peteski

  • Crew
  • *
  • Posts: 35477
  • Gender: Male
  • Honorary Resident Curmudgeon
  • Respect: +6710
    • Coming (not so) soon...
Re: one question about T-Trak
« Reply #14 on: November 24, 2026, 10:02:07 AM »
0
N-Trak: https://web.archive.org/web/19990203041725/http://www.ntrak.org/ntkstd.html

I should have expected that, and you're the perfect person to show this.  Yes, some older documentation shows various spellings, but back then this was a volunteer-ran organization, with pretty much no document or branding controls.

This is the current status: https://nrail.org/History
Notice that the original newsletter header has no hyphen and all letters are capitalized. 
But of course NRail uses upper and lower case letters.  Because . . . why not?!
. . . 42 . . .